Quick answers
What is this project?
Residential Villas construction project by M/s. Urbanrise Dwellings Private Limited located at Survey Nos. 2 and 29, Pashambanda Village, Rajendranagar, Shamshabad Mandal, Ranga Reddy District, Telangana is an approved residential project in Pashambanda, Shamshabad, Ranga Reddy, Telangana. It plans 244 units of up to 3 floors on 28.2 acres.
Who is building it?
The applicant is Urbanrise Dwellings Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Oct 2025), as of 27 Nov 2026.
Where is it?
In Pashambanda, Shamshabad, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹260 crore and a site of 28.2 acres.
When was it filed?
The application was filed on 22 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Oct 2025 |
| Application filed | 22 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Urbanrise Dwellings Private Limited |
| Use | Residential |
| Units | 244 |
| Floors (tallest) | 3 |
| Land area | 28.2 acres (11.4 ha) |
| Built-up area | 1,18,241 m² (12,72,734 sq ft) |
| Plot area | 1,06,043 m² (11,41,436 sq ft) |
| Project cost | ₹260 crore |
| Village / locality | Pashambanda |
| Taluk / tehsil | Shamshabad |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02762 |
What the filings say
What is planned
Urbanrise Dwellings Private Limited proposes to develop a gated community of residential villas on 11.422 hectares (28.22 acres) of land at Pashambanda Village. The project is designed to provide 244 villas, each consisting of a ground floor and two upper floors (G+2).
According to the applicant's project report, the development includes several supporting components and amenities:
- Residential Villas: 244 units with a total built-up area of 1,08,997.6 square metres.
- Amenities: Two separate amenity blocks (G+2) with a combined built-up area of 8,166.8 square metres.
- Commercial Building: A G+2 structure with a built-up area of 1,076 square metres.
- Infrastructure: A sewage treatment plant (STP) with a capacity of 175 kilolitres per day (KLD), a clubhouse, a pickleball court, and a swimming pool.
The total built-up area for the entire project is 1,18,240.5 square metres. The construction is expected to take approximately 36 months.
Layout and design
The site layout is organized with a central spinal road of 12 metres width, sub-arterial roads of 10 metres, and a connecting road of 24 metres. The design incorporates Indian architectural principles of "Vastu."
Land allocation within the 11.422-hectare site is distributed as follows:
- Villas and Amenities: 4.85 hectares
- Green Area: 1.206 hectares (approximately 10.5% of the site)
- Road Area: 2.874 hectares
- Open Area: 1.438 hectares
- Services: 0.236 hectares
Each villa is provided with two car parking spaces. The project includes a 24-metre wide road widening area along the southern boundary.
Land and surroundings
The project site is located at Survey Nos. 2 and 29 in Pashambanda Village, Shamshabad Mandal. The land is currently fallow and classified as residential by the Hyderabad Metropolitan Development Authority (HMDA). The topography consists of rocky plains, which will require cut and fill operations during construction.
The site is surrounded by open lands in all directions. It is connected to the Srinagar-Kanyakumari highway via an existing 24-metre wide road. The nearest railway station is Umdanagar, located 3.02 km from the site.
Water, power and access
Water: During the occupation stage, the total water requirement is estimated at 178.6 KLD. Fresh water will be drawn from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). The project will use a dual plumbing system to reuse 62.7 KLD of treated wastewater for flushing and green belt development, reducing the effective fresh water demand to 115.9 KLD. During construction, water demand will be approximately 50 to 100 cubic metres per day, sourced from groundwater or municipal tankers.
Power: The total connected load for the project is estimated at 3,259 KW, with a maximum demand of 3,881 KVA. Power will be drawn from the Telangana State Southern Power Distribution Company Limited (TGSPDCL). The applicant proposes to use solar energy for fencing and partially for hot water. Three diesel generator (DG) sets of 250 KVA each are planned for backup during the occupation phase.
Environmental safeguards
Waste Management: The project is expected to generate 800.5 kg of municipal solid waste per day. Biodegradable waste (384.2 kg/day) will be treated in an organic waste converter, while recyclable waste will be sold to authorized recyclers. Construction and demolition waste is estimated at 5,912 tons over the two-year construction period.
Sewage Treatment: A 175 KLD STP using Fluidized Aerobic Bio Reactor (FAB) technology will be installed. Treated water will be used for landscaping and flushing to achieve zero liquid discharge.
Drainage and Rainwater: The applicant plans to install 244 rainwater harvesting pits, each measuring 1.5m x 1.5m x 2.0m. Stormwater drains will be designed with a width of 290 mm to manage a total discharge of 1.045 cubic metres per second.
Greenery: A total of 12,066.7 square metres is reserved for green area. While 32 of the 36 existing trees on site are proposed for removal, they will be translocated to the site boundary.
Urbanrise Dwellings Private Residential Villas Construction site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 28.2 acres, this one is larger than 88% of them.
44 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pashambanda, Shamshabad, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- IRA wings by M/s Wings by IRA LLP — environmental approval granted, 250 m away
- Residential Buildings by M/s. Essjay Axiom Pvt. Ltd., Represented by its GPA… — environmental approval granted, 1 km away
- Residential Buildings by M/s. Essjay Axiom Pvt. Ltd., Represented by its GPA… — cleared for impact study, 1 km away
- Building project by M/s Sumadhura Infracon Private Limited — environmental approval granted, 1.2 km away
- Jains Pramukh Samridhi Tower by M/s. Jain Construction — cleared for impact study, 1.4 km away
- Residential High Rise Gated Community by M/s Ramky Estates & Farms Limited @… — environmental approval granted, 1.6 km away
- Residential High Rise Gated Community by M/s Ramky Estates & Farms Limited @… — cleared for impact study, 1.6 km away
- Residential Apartments construction project located at Survey Nos. 229/E/1/3,… — environmental approval granted, 1.6 km away