Quick answers
What is this project?
Residential Apartments Construction Project by M/s. SHIVA SAI CONSTRUCTIONS located at Plot Nos. 1-15, Survey Nos. 442, 443 and 444, Nallagandla Village, Serilingampally Mandal, Ranga Reddy District is an approved residential project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans 116 units in 1 tower of up to 15 floors on 1.3 acres.
Who is building it?
The applicant is Shiva Sai Constructions.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Nov 2026), as of 27 Nov 2026.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹96 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 23 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Nov 2026 |
| Application filed | 23 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shiva Sai Constructions |
| Use | Residential |
| Units | 116 |
| Towers | 1 |
| Floors (tallest) | 15 |
| Basements | 3 |
| Parking spaces | 226 |
| Land area | 1.3 acres (0.5 ha) |
| Built-up area | 38,488 m² (4,14,281 sq ft) |
| Plot area | 5,215 m² (56,134 sq ft) |
| Project cost | ₹96 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02811 |
What the filings say
What is planned
Shiva Sai Constructions proposes to build a gated community of residential apartments in Nallagandla village. The project report describes a single residential block consisting of three cellar floors, a stilt floor, and 15 upper floors (3C+S+15), reaching a maximum of 16 floors above ground.
The development is planned to house 116 apartment units. The total built-up area is 38,487.8 square metres, which includes 24,260.7 square metres for the residential block, 897 square metres for amenities, and 13,330.1 square metres for parking. The project is designed to accommodate an anticipated population of 800 to 1,000 residents.
Project Components
| Item | Detail |
|---|---|
| Total Units | 116 apartments |
| Number of Blocks | 1 |
| Floor Configuration | 3 Cellars + Stilt + 15 Floors |
| Total Built-up Area | 38,487.8 sq.m. |
| Parking Capacity | 166 four-wheelers, 60 two-wheelers |
| Estimated Population | 800 - 1,000 persons |
| Construction Timeline | Approximately 30 months |
Layout and design
The site layout includes a 7-metre wide driveway at the ground level and a 4.5-metre wide driveway in the cellars. Access to the parking levels is provided via two ramps, each 6 metres wide with a slope of 1 in 8. The block will be equipped with four lifts, each having a capacity of 10 to 15 passengers.
Architectural designs incorporate "Vastu" principles. Amenities include a multi-activity hall and open terrace areas. The parking provision is distributed across three cellar floors and a stilt floor, exceeding the guidelines prescribed by the Hyderabad Metropolitan Development Authority (HMDA).
Land and surroundings
The project is spread over 0.5215 hectares (1.28 acres) at Plot Nos. 1-15, Survey Nos. 442, 443, and 444. The site is located near the Nallagandla flyover, with a proposed 45-metre wide road to the south. Residential buildings surround the site to the west, while open land lies to the north and east. The nearest railway station is Lingampally, located approximately 0.65 km away.
The land is classified as residential by the HMDA. The topography consists of rocky plains, requiring cut and fill operations. The applicant noted that 9 trees exist on the site; 4 trees within the construction footprint are proposed for translocation to the site boundary, while the remaining trees will be retained.
Water, power and access
During the occupation phase, the total water requirement is estimated at 84.4 kilolitres per day (KLD). This will be drawn from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). To reduce fresh water consumption, a dual plumbing system will be used, recycling 29.6 KLD of treated wastewater for flushing and green belt development. The effective fresh water demand is projected at 54.8 KLD.
Power will be sourced from the state transmission company (TRANSCO). The total connected load is estimated at 1,002 kW, with a maximum demand of 601 kW. Two diesel generator sets of 500 kVA each are proposed for emergency backup. Solar energy will be utilized for fencing and partially for hot water requirements.
Environmental safeguards
A sewage treatment plant (STP) with a capacity of 85 KLD, based on Fluidized Aerobic Bio Reactor (FAB) technology, will be installed. Treated sewage will be reused, and any excess will be discharged into municipal sewer lines. For solid waste, the project expects to generate 377 kg per day, which will be segregated at source into biodegradable and recyclable streams. An organic waste converter is proposed for wet waste.
Storm water management includes 12 rainwater harvesting pits, each measuring 1.5m x 1.5m x 2.0m. To mitigate the urban heat island effect, the applicant proposes using "cool roofs" with light shades and high albedo paints (at least 0.4 albedo) to increase reflectivity.
SHIVA SAI CONSTRUCTIONS Residential Apartments Construction site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.3 acres, this one is smaller than 93% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environmental Clearance of M/s. Mana Developers - Construction of… — environmental approval granted, 200 m away
- Construction of Mall& Multiplex Building by M/s. Mana Developers — environmental approval granted, 200 m away
- Residential Apartments Construction Project by SRI PULIPATI SREENIVAS and… — lapsed, 250 m away
- Sujay Global by Sri. Mohit Agarwal and Others - Construction of Residential… — environmental approval granted, 1000 m away
- Building project by Tridasa Realty Ventures Private Limited — environmental approval granted, 1000 m away
- Building project by Tridasa Realty Ventures Private Limited — cleared for impact study, 1000 m away
- SANALI GULMOHAR by Mr. Ali Mohammed Haq and Ms. Sana Fatima Haq — environmental approval granted, 1 km away
- Building project by Cyberbad Citizens Health Services Private Limited — environmental approval granted, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.