What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ranga Reddy, Telangana

Residential Apartments Construction Project located at Survey No. 379/ 2 PART of survey No: 379, Premavathipet Village, Rajendra Nagar Mandal, Ranga Reddy District, Telangana - DSR HYVEN by M/s Veerabhadra Infratech Private Limited

Residential Apartments Construction Project located at Survey No. 379/ 2 PART of survey No: 379, Premavathipet Village, Rajendra Nagar Mandal, Ranga Reddy District, Telangana - DSR HYVEN by M/s Veerabhadra Infratech Private Limited is an approved residential project in Ghmc(Part), Rajendranagar, Ranga Reddy, Telangana. It plans 486 units in 2 towers of up to 42 floors on 4.1 acres. Its stated project cost is ₹538 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Jun 2025).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Residential Apartments Construction Project located at Survey No. 379/ 2 PART of survey No: 379, Premavathipet Village, Rajendra Nagar Mandal, Ranga Reddy District, Telangana - DSR HYVEN by M/s Veerabhadra Infratech Private Limited is an approved residential project in Ghmc(Part), Rajendranagar, Ranga Reddy, Telangana. It plans 486 units in 2 towers of up to 42 floors on 4.1 acres.

Who is building it?

The applicant is Veerabhadra Infratech Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Jun 2025), as of 27 Nov 2026.

Where is it?

In Ghmc(Part), Rajendranagar, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹538 crore and a site of 4.1 acres.

When was it filed?

The application was filed on 12 May 2025.

Project details

StatusEnvironmental approval granted
Status since20 Jun 2025
Application filed12 May 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantVeerabhadra Infratech Private Limited
UseResidential
Units486
Towers2
Floors (tallest)42
Basements2
Parking spaces1,073
Land area4.1 acres (1.6 ha)
Built-up area2,11,189 m² (22,73,217 sq ft)
Plot area16,371 m² (1,76,216 sq ft)
Project cost₹538 crore
Village / localityGhmc(Part)
Taluk / tehsilRajendranagar
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-02930

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 May 2025 (this page)Environmental approval granted4.1 acres₹538 crore
Early planning filed 31 Jan 2025Cleared for impact study4.1 acres₹538 crore

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.1 acres, this one is smaller than 65% of them.

86 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghmc(Part), Rajendranagar, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Veerabhadra Infratech Private Limited in Ranga Reddy

All 3 Veerabhadra Infratech projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.