What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ranga Reddy, Telangana

Residential Apartments construction project located at Survey No. 106, Kokapet, Gandipet, Ranga Reddy district - Lansum Elena by M/s. Lansum Enpoint Developers LLP

Residential Apartments construction project located at Survey No. 106, Kokapet, Gandipet, Ranga Reddy district - Lansum Elena by M/s. Lansum Enpoint Developers LLP is an approved residential project in Kokapet, Gandipet, Ranga Reddy, Telangana. It plans 550 units in 3 towers of up to 58 floors on 4.2 acres. Its stated project cost is ₹611.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Aug 2025).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Residential Apartments construction project located at Survey No. 106, Kokapet, Gandipet, Ranga Reddy district - Lansum Elena by M/s. Lansum Enpoint Developers LLP is an approved residential project in Kokapet, Gandipet, Ranga Reddy, Telangana. It plans 550 units in 3 towers of up to 58 floors on 4.2 acres.

Who is building it?

The applicant is Lansum Enpoint Developers LLP.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Aug 2025), as of 27 Nov 2026.

Where is it?

In Kokapet, Gandipet, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹611.9 crore and a site of 4.2 acres.

When was it filed?

The application was filed on 22 Jul 2025.

Project details

StatusEnvironmental approval granted
Status since13 Aug 2025
Application filed22 Jul 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorBuildings & townships
ApplicantLansum Enpoint Developers LLP
UseResidential
Units550
Towers3
Floors (tallest)58
Basements4
Parking spaces1,154
Land area4.2 acres (1.7 ha)
Built-up area2,27,391 m² (24,47,614 sq ft)
Plot area16,961 m² (1,82,567 sq ft)
Project cost₹611.9 crore
Village / localityKokapet
Taluk / tehsilGandipet
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-02935

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 22 Jul 2025 (this page)Environmental approval granted4.2 acres₹611.9 crore
Amendment filed 19 Mar 2025Cleared for impact study4.2 acres₹611.9 crore

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.2 acres, this one is smaller than 63% of them.

235 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kokapet, Gandipet, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lansum Enpoint Developers LLP in Ranga Reddy

All 3 Lansum Enpoint Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.