Quick answers
What is M/s. Tirumala Road Liners.?
M/s. Tirumala Road Liners is an approved mining project in Sunkidi, Talamadugu, Adilabad, Telangana. The site covers 2.5 acres.
Who is building it?
The applicant is Tirumala Road Liners.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jul 2026), as of 27 Nov 2026.
Where is it?
In Sunkidi, Talamadugu, Adilabad, Telangana.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jul 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Tirumala Road Liners |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Sunkidi |
| Taluk / tehsil | Talamadugu |
| District | Adilabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02958 |
In context
14 applications in Adilabad since January 2022 are in the same category (Mining): 12 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Sunkidi, Talamadugu, Adilabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Assistant Director of Mines and Geology - Adilabad - 1 Ha., — environmental approval granted, 0 m away
- 1.0 Ha. Building Stone and Road Metal quarry of M/s. Tirumala Road Liners, Sy.… — more information requested, 0 m away
- Sri Md. Shafi-Ur-Rahaman, Was Applied for 1st Renewal of Quarry Lease for… — environmental approval granted, 1000 m away
- M/s. Thirumala Stone Crusher -Road Metal and Building Stone — environmental approval granted, 1.2 km away
- Sri Gutta Praveen -Road Metal and Building Stone -2.023 ha — environmental approval granted, 1.3 km away
- M/s. Thirumala Stone Crusher -Road Metal and Building Stone quarry-1.012 ha in… — environmental approval granted, 1.5 km away
- Water and irrigation project by Greenko TG01 IREP Private Limited — cleared for impact study, 10.6 km away
- Greenko TS01 Off-Stream Closed Loop Pumped Storage Project (750 MW) — cleared for impact study, 10.6 km away
More from Tirumala Road Liners in Adilabad
- 1.0 Ha. Building Stone and Road Metal quarry of M/s. Tirumala Road Liners, Sy.… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.