Project details
| Status | Under environmental review |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 3 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Telangana State Education and Welfare Infrastructure Development Corporation |
| Use | Education |
| Floors (tallest) | 3 |
| Land area | 17.6 acres (7.1 ha) |
| Built-up area | 46,993 m² (5,05,828 sq ft) |
| Plot area | 71,225 m² (7,66,659 sq ft) |
| Project cost | ₹200 crore |
| Village / locality | Ankusapur |
| Taluk / tehsil | Asifabad |
| District | Kumuram Bheem Asifabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02973 |
In context
58 applications in Kumuram Bheem Asifabad since January 2022 are in the same category (Buildings & townships): 6 approved, 26 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 17.6 acres, this one is larger than 98% of them.
Where it is
Ankusapur, Asifabad, Kumuram Bheem Asifabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 7.5220 ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 6.6 km away
- Diversion of 7.5220 ha of Forest Land proposavfor laying of Optical Fiber… — more information requested, 9 km away
- Diversion of 7.5220 ha of Forest Land proposavfor laying of Optical Fiber… — under forest review, 9 km away
- Dorli Opencast-I Expansion Project — lapsed, 10.6 km away
- PR Road to Routsankepally via Goriyaguda — more information requested, 11.4 km away
- Diversion of 0.094 Ha of Forest Land for Construction of 4G Mobile Tower under… — decision issued, 11.8 km away
- Diversion of 0.094 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 11.8 km away
- Greenfield 1X100 KLPD Grain based Ethanol Plant with 3.0 MW Captive Power… — decision issued, 12.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.