FMCG Manufacturing Project with Ancillary Warehousing Facility by M/s. Hindustan Unilever Limited

FMCG Manufacturing Project with Ancillary Warehousing Facility by M/s. Hindustan Unilever Limited is an approved industrial building project in Shabad, Ranga Reddy, Telangana. It plans buildings of up to 4 floors on 70 acres. Its stated project cost is ₹1,682 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Apr 2026).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

FMCG Manufacturing Project with Ancillary Warehousing Facility by M/s. Hindustan Unilever Limited is an approved industrial building project in Shabad, Ranga Reddy, Telangana. It plans buildings of up to 4 floors on 70 acres.

Who is building it?

The applicant is Hindustan Unilever Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Apr 2026), as of 27 Nov 2026.

Where is it?

In Shabad, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹1,682 crore and a site of 70 acres.

When was it filed?

The application was filed on 18 Feb 2026.

Project details

StatusEnvironmental approval granted
Status since18 Apr 2026
Application filed18 Feb 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHindustan Unilever Limited
UseIndustrial
Floors (tallest)4
Parking spaces505
Land area70 acres (28.3 ha)
Built-up area1,40,293 m² (15,10,100 sq ft)
Plot area2,83,290 m² (30,49,305 sq ft)
Project cost₹1,682 crore
Village / localityShabad
Taluk / tehsilShabad
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03010

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 70 acres, this one is larger than 96% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shabad, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.