What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Sangareddy, Telangana

Residential Apartments Construction Project located at Plot No. 06 in Survey No. 30, Osmannagar Village, Ramachandrapuram Mandal, Sanga Reddy District, Telangana by M/s. Venusta Ventures Private Limited

Residential Apartments Construction Project located at Plot No. 06 in Survey No. 30, Osmannagar Village, Ramachandrapuram Mandal, Sanga Reddy District, Telangana by M/s. Venusta Ventures Private Limited is a proposed residential project in Osmannagar, Ramchandrapuram, Sangareddy, Telangana. The site covers 5.7 acres. Its stated project cost is ₹1,150 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 26 Sept 2026).

See it on the live map All projects in Sangareddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Residential Apartments Construction Project located at Plot No. 06 in Survey No. 30,…

Project details

StatusUnder environmental review
Status since26 Sept 2026
Application filed22 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantVenusta Ventures Private Limited
UseResidential
Land area5.7 acres (2.3 ha)
Built-up area3,61,726 m² (38,93,582 sq ft)
Project cost₹1,150 crore
Village / localityOsmannagar
Taluk / tehsilRamchandrapuram
DistrictSangareddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03032

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Oct 2026Under environmental review5.7 acres₹1,150 crore
Early planning filed 22 Aug 2026 (this page)Under environmental review5.7 acres₹1,150 crore

In context

350 applications in Sangareddy since January 2022 are in the same category (Buildings & townships): 260 approved, 52 filed or under review, and 38 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.7 acres, this one is smaller than 59% of them.

153 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Osmannagar, Ramchandrapuram, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.