One of 2 filings for this project. The project's main page, with every filing and where each stands: Inclusion of Resin Manufacturing facility in consented/existing Plywood and Block Boards…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 1 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Divyasai Boards Private Limited |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹17.3 crore |
| Village / locality | Motighanpuram |
| Taluk / tehsil | Balanagar |
| District | Mahabubnagar |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03045 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 1 Oct 2026 (this page) | Under environmental review | 5.9 acres | ₹17.3 crore |
| Early planning filed 26 Aug 2025 | Cleared for impact study | 5.9 acres | ₹17.3 crore |
In context
16 applications in Mahabubnagar since January 2022 are in the same category (Industry): 12 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 days from filing to approval. At 5.9 acres, this one is smaller than 94% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Motighanpuram, Balanagar, Mahabubnagar, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Inclusion of Resin Manufacturing facility in consented/existing Plywood and… — cleared for impact study, 0 m away
- M/s. Dhatri Minerals was obtained Quarry lease fover an extent of 18.02 Acres,… — environmental approval granted, 350 m away
- Mining project by M/s Dhatri Minerals — lapsed, 350 m away
- Mining project by M/s Dhatri Minerals — lapsed, 350 m away
- Mining project by M/s. Dhatri Minerals. — environmental approval granted, 350 m away
- Industrial project by M/s. Sri Navadurga Billets Pvt. Ltd. — environmental approval granted, 800 m away
- Industrial project by M/s. Sri Navadurga Billets Pvt. Ltd. — cleared for impact study, 800 m away
- Expansion of existing unit for proposed inclusion of Resin manufacturing… — environmental approval granted, 800 m away