Quick answers
What is this project?
IT Office and Hotel Building "THE SQUARE "by M/s. Mack Soft Tech Private Limited is an approved mixed-use project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. It plans 152 units in 2 towers of up to 9 floors on 6 acres.
Who is building it?
The applicant is Mack Soft Tech Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 May 2026), as of 27 Nov 2026.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹267 crore and a site of 6 acres.
When was it filed?
The application was filed on 13 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 May 2026 |
| Application filed | 13 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Mack Soft Tech Private Limited |
| Use | Mixed use |
| Units | 152 |
| Towers | 2 |
| Floors (tallest) | 9 |
| Basements | 2 |
| Parking spaces | 1,190 |
| Land area | 6 acres (2.4 ha) |
| Built-up area | 1,14,382 m² (12,31,196 sq ft) |
| Plot area | 24,180 m² (2,60,271 sq ft) |
| Project cost | ₹267 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03165 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is smaller than 51% of them.
293 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. Sify Technologies Limited — environmental approval granted, 500 m away
- Proposed Residential complex consisting of 1 tower & Club house: B. Naveen… — withdrawn, 800 m away
- Proposed Residential complex consisting of 1 tower & Club house: B. Naveen… — cleared for impact study, 800 m away
- Hotel and Convention Center by M/s. Shree Venkateshwara Hotels and Convention — environmental approval granted, 950 m away
- Hotel and Convention Center by M/s. Shree Venkateshwara Hotels and Convention — environmental approval granted, 950 m away
- Proposed Expansion of Commercial Complex by M/s Mahaveer Developers &… — lapsed, 950 m away
- Office Building project by M/s. Cyient Limited — lapsed, 1.2 km away
- Construction of Hotel & Office Building by M/s. ARS Hotels — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.