Environmental approval grantedBuildings & townships · Medchal Malkajgiri, Telangana

UTTARA - Residential Villa Project by M/s. Udaysree Developers

UTTARA - Residential Villa Project by M/s. Udaysree Developers is an approved residential project in Dundigal, Gandimaisamma Dundigal, Medchal Malkajgiri, Telangana. It plans 233 units of up to 3 floors on 15 acres. Its stated project cost is ₹140 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 31 Mar 2026).

See it on the live map All projects in Medchal Malkajgiri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

UTTARA - Residential Villa Project by M/s. Udaysree Developers is an approved residential project in Dundigal, Gandimaisamma Dundigal, Medchal Malkajgiri, Telangana. It plans 233 units of up to 3 floors on 15 acres.

Who is building it?

The applicant is Udaysree Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 31 Mar 2026), as of 27 Nov 2026.

Where is it?

In Dundigal, Gandimaisamma Dundigal, Medchal Malkajgiri, Telangana.

How big is it?

It has a stated cost of ₹140 crore and a site of 15 acres.

When was it filed?

The application was filed on 12 Feb 2026.

Project details

StatusEnvironmental approval granted
Status since31 Mar 2026
Application filed12 Feb 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantUdaysree Developers
UseResidential
Units233
Floors (tallest)3
Basements1
Land area15 acres (6.1 ha)
Built-up area58,335 m² (6,27,912 sq ft)
Plot area60,896 m² (6,55,478 sq ft)
Project cost₹140 crore
Village / localityDundigal
Taluk / tehsilGandimaisamma Dundigal
DistrictMedchal Malkajgiri
StateTelangana
Location fromSite area on record
Our referenceWID-TG-03174

What the filings say

What is planned

Udaysree Developers proposes to develop a residential villa project named 'Uttara' at Dundigal village in Medchal Malkajgiri district. The applicant's project report states that the development will consist of 233 residential villas and an amenities block.

The villas are designed with a Ground + 2 upper floors configuration. The amenities block is planned with a Cellar + Ground + 3 upper floors. The project has a total built-up area of 58,335.00 square metres on a plot area of 60,896.18 square metres (approximately 6.09 hectares or 15.047 acres).

ItemDetail
Total Units233 Villas + Amenities
Tallest Building Height14.99 m
Total Population1,225 persons
Ground Coverage30,251.52 sq.m (49.68%)
Road Area15,983.70 sq.m (26.25%)
Green Belt Area6,154.36 sq.m (10.11%)
Open Area / Tot-Lot6,105.62 sq.m (10.03%)
Total Water Requirement162.0 KLD
Total Power Requirement1,180 kWh

Layout and design

The layout is designed to optimize land utilization while adhering to Hyderabad Metropolitan Development Authority (HMDA) regulations. The site is situated adjacent to the Nehru Outer Ring Road (ORR).

Parking facilities include dedicated exclusive parking for each individual villa. The amenities block will have approximately 872 square metres of designated parking area integrated with both cellar and surface parking. Additional surface parking is provided for visitors.

Water, power and access

The total water demand is estimated at 162.0 kilolitres per day (KLD). Fresh water requirement of 107.0 KLD will be sourced from municipal supply and groundwater. The project is expected to generate 130.0 KLD of wastewater, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 160 KLD using Moving Bed Biofilm Reactor (MBBR) technology.

Power will be sourced from the State Electricity Board. For emergency backup, three diesel generator (DG) sets of 500 kVA each are proposed. Energy conservation measures include the use of LED and CFL lighting, and solar energy installations intended to meet approximately 5% (59 kW) of the total energy requirement.

Environmental safeguards

The applicant proposes a Zero Liquid Discharge (ZLD) approach where treated wastewater will be reused for flushing (55.0 KLD) and greenbelt development (62.0 KLD). During the rainy season, surplus treated water is planned to be diverted to industrial partners such as brick manufacturing units or batching plants.

For rainwater harvesting, each villa will have one percolation pit, with an additional 15 pits located near the amenities and open areas. Solid waste generation is estimated at 605 kg per day. This will be segregated at source; biodegradable waste (363 kg/day) will be processed in an on-site Organic Waste Converter with a capacity of 400 kg/day, while non-biodegradable waste will be sent to authorized vendors.

A greenbelt covering 6,154.36 square metres (10.11% of the plot) will be developed along the boundary and roads using native evergreen and deciduous species such as Mango, Neem, and Ashoka.

Timeline

The project report notes that construction will be avoided during the monsoon season. The Environmental Management Plan (EMP) includes a capital budget of ₹220.00 lakhs for the construction phase and a recurring annual budget of ₹30.00 lakhs for the operational phase.

Udaysree Developers UTTARA - Residential Villa site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Udaysree Developers UTTARA - Residential Villa: Site layout: villa plots, roads, greenbelt and amenities (preview)🔒 Sign in free to see it
Site layout: villa plots, roads, greenbelt and amenities
Udaysree Developers UTTARA - Residential Villa: Satellite view of the project site with boundary coordinates (preview)🔒 Sign in free to see it
Satellite view of the project site with boundary coordinates
Udaysree Developers UTTARA - Residential Villa: Location map showing project site relative to the Outer Ring Road (preview)🔒 Sign in free to see it
Location map showing project site relative to the Outer Ring Road
Udaysree Developers UTTARA - Residential Villa: Typical design for rainwater recharging pits (preview)🔒 Sign in free to see it
Typical design for rainwater recharging pits

In context

394 applications in Medchal Malkajgiri since January 2022 are in the same category (Buildings & townships): 300 approved, 54 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 15 acres, this one is larger than 87% of them.

46 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dundigal, Gandimaisamma Dundigal, Medchal Malkajgiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.