Quick answers
What is this project?
Proposed to Conduct Semi Mechanized Opencast Mining Method Quarrying for Building Stone & Road Metal Quarry in an Area of 2.530 Ha With Proposed Production of Building Stone & Road Metal Is @ 54357.6 M3/Annum by Sri Kandula Indrasena Reddy is an approved mining project in Pulukurti, Damera, Hanumakonda, Telangana. The site covers 6.3 acres.
Who is building it?
The applicant is Kandula Indrasena Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jul 2026), as of 27 Nov 2026.
Where is it?
In Pulukurti, Damera, Hanumakonda, Telangana.
How big is it?
It has a stated cost of ₹64 lakh and a site of 6.3 acres.
When was it filed?
The application was filed on 7 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jul 2026 |
| Application filed | 7 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kandula Indrasena Reddy |
| Land area | 6.3 acres (2.5 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Pulukurti |
| Taluk / tehsil | Damera |
| District | Hanumakonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03248 |
In context
107 applications in Hanumakonda since January 2022 are in the same category (Mining): 78 approved, 7 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.3 acres, this one is larger than 67% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Pulukurti, Damera, Hanumakonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Countryside Region Developers LLP — environmental approval granted, 500 m away
- Pinnoju Subramanya Chary- Proposed Colour Granite Quarry an extent of 3.370… — environmental approval granted, 1 km away
- Mining project by M/s. Venkateshwara Stone Crusher — environmental approval granted, 4 km away
- Mining project by M/s. Siri Stone Crusher — environmental approval granted, 4.3 km away
- Mining project by M/s. Siri Stone Crushers — lapsed, 4.3 km away
- Mining project by M/s. Venkateshwara Stone Crusher — environmental approval granted, 4.4 km away
- Mining project by M/s Sai Sri Infrastructure — environmental approval granted, 5.1 km away
- Mining project by M/s. Madhava Constructions (P) Ltd — environmental approval granted, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.