Quick answers
What is this project?
Residential Apartments Construction Project at GHMC H. No. 4-1-825/10 to 21, GHMC H. No. 4-1-825/47, GHMC H. No. 4-1-825/22 to 46, Abids, Hyderabad, Telangana by M/s. KPC Parameswara Buildcon Private Limited is a proposed building project in Na, Nampally, Hyderabad, Telangana. The site covers 2.3 acres.
Who is building it?
The applicant is KPC Parameswara Buildcon Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Na, Nampally, Hyderabad, Telangana.
How big is it?
It has a stated cost of ₹345 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 22 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 22 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | KPC Parameswara Buildcon Private Limited |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹345 crore |
| Village / locality | Na |
| Taluk / tehsil | Nampally |
| District | Hyderabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03313 |
In context
83 applications in Hyderabad since January 2022 are in the same category (Buildings & townships): 56 approved, 17 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.3 acres, this one is smaller than 59% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Nampally, Hyderabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment of NORTHSTAR SP - Residential Project by NORTHSTAR HOMES — environmental approval granted, 200 m away
- Amendment of NORTHSTAR SP - Residential Project by NORTHSTAR HOMES — lapsed, 200 m away
- Residential Building by M/s. Aadinath Developers — environmental approval granted, 400 m away
- Proposed Hospital Project by M/s. Osmania General Hospital — environmental approval granted, 950 m away
- Proposed Hospital Project by M/s. Osmania General Hospital — cleared for impact study, 950 m away
- Residential Building Consisting of 2 Cellars + 2 Stilts+ 12 Upper Floors in… — under environmental review, 1 km away
- Residential Building Consisting of 2 Cellars + 2 Stilts+ 12 Upper Floors in… — environmental approval granted, 1 km away
- Proposed residential apartment by M/s. Vishal Developers and Builders Private… — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.