Quick answers
What is this project?
Mixed Use Construction Project located at Plot No. 15, NEOPOLIS Layout, Phase-III, Survey Nos. 239 and 240, Kokapet Village, Gandipet Mandal, Ranga Reddy District, Telangana - Epicenter by M/s. GHR Lakshmi Urbanblocks Developers LLP is a proposed building project in Kokapet (Og), Gandipet, Ranga Reddy, Telangana. The site covers 4 acres.
Who is building it?
The applicant is Ghr Lakshmi Urbanblocks Developers LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kokapet (Og), Gandipet, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹984 crore and a site of 4 acres.
When was it filed?
The application was filed on 14 Jul 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mixed Use Construction Project located at Plot No. 15, NEOPOLIS Layout, Phase-III,…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 14 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ghr Lakshmi Urbanblocks Developers LLP |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹984 crore |
| Village / locality | Kokapet (Og) |
| Taluk / tehsil | Gandipet |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03458 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jul 2026 (this page) | Under environmental review | 4 acres | ₹984 crore |
| Early planning filed 10 Jun 2026 | Cleared for impact study | 4 acres | ₹984 crore |
What the filings say
What is planned
M/s GHR Lakshmi Urbanblocks Developers LLP proposes to develop a mixed-use construction project named "Epicenter" on 1.631 hectares (4.03 acres) of land in the Neopolis Layout at Kokapet. The applicant's project report describes a single high-rise block comprising residential, commercial, and hospitality components with a maximum height of 50 floors above ground (7 Basements + Lower Ground + Ground + 48 Floors).
The project is designed to include 183 residential apartment units and a hotel with 400 guest rooms. The commercial segment features retail shops, a food court, and office spaces.
Built-Up Area Statement
| Item | Detail |
|---|---|
| Total Site Area | 16,316.36 m² |
| Total Built-up Area | 3,94,492 m² |
| Residential Area | 1,02,042 m² |
| Office Area | 98,956 m² |
| Hotel Area | 54,972 m² |
| Retail Area | 29,165 m² |
| Parking Area | 98,660 m² |
| Amenities Area | 10,697 m² |
| Green Area | 2,302.17 m² |
Layout and design
The single block is divided into two primary wings: a Residential Wing and a Commercial + Hotel Wing. The Residential Wing includes 42 residential levels above the retail and banquet floors, topped by crown amenities and a terrace. The Commercial + Hotel Wing includes 30 commercial levels and 11 hotel floors, also featuring crown amenities.
Circulation within the site is facilitated by an 11 m wide ground floor driveway and a 45 m wide connecting road. The building will be served by 14 lifts, each with a capacity for 15 persons. The design incorporates Vastu principles and low-impact development strategies, such as cool roofs and pervious paving to mitigate the urban heat island effect.
Land and surroundings
The project is located at Plot No. 15 in Phase-III of the Neopolis Layout. The site is currently surrounded by open lands in all directions. It connects on the north side to an existing 45 m wide road providing access to the Outer Ring Road (ORR) service road. The nearest rail connectivity is the Tellapur Railway Station, approximately 8.51 km away. The land is reported to be devoid of significant tree cover due to existing biogenic pressures, though the applicant plans to develop 2,302.17 m² of greenery.
Water, power and access
During the operational phase, water will be sourced from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). The total water demand is estimated at 1,130.9 kilolitres per day (KLD). By using a dual plumbing system for flushing and recycling treated wastewater, the applicant expects to reduce fresh water consumption to 776.5 KLD. An on-site Sewage Treatment Plant (STP) with a capacity of 1,130 KLD using Sequencing Batch Reactor (SBR) technology is proposed.
Power will be drawn from TRANSCO/TGSPDCL. The project includes six 2,000 kVA diesel generator (DG) sets for emergency backup. Parking is planned across 7 basement floors and 5 podium levels, providing space for 2,500 four-wheelers and 841 two-wheelers.
Environmental safeguards
Solid waste generation is estimated at 6,779 kg/day. The applicant proposes source-level segregation into biodegradable and non-biodegradable waste. Biodegradable waste will be processed in an on-site Organic Waste Converter with a capacity of 3,260 kg.
Stormwater management includes 21 rainwater harvesting pits (1.5 m x 1.5 m x 2.0 m) and two 90 m³ sumps for domestic reuse. For energy conservation, the project will utilize LED lighting, solar-powered external lighting, and solar water heaters for 90 residential units.
Timeline
The applicant estimates the total project construction duration at approximately 60 months. Construction will involve significant earthworks, with an estimated 12,519 m³ of cutting and 10,016 m³ of filling, resulting in a surplus cut of 2,504 m³.
GHR Lakshmi Urbanblocks Mixed Use Construction Project Located site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 65% of them.
223 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kokapet (Og), Gandipet, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mixed Use Construction Project located at Plot No. 15, NEOPOLIS Layout,… — cleared for impact study, 0 m away
- High-rise Residential Apartments By Godrej Properties Limited, Plot No 16, Sy.… — environmental approval granted, 100 m away
- High-rise Residential Apartments By Godrej Properties Limited, Plot No 16, Sy.… — cleared for impact study, 100 m away
- Building project by M/s. DE Blueoak and P Mangatram Properties LLP — environmental approval granted, 150 m away
- Building project by M/s. DE Blueoak and P Mangatram Properties LLP — cleared for impact study, 150 m away
- Building project by M/s. DE Blueoak and P Mangatram Properties LLP — environmental approval granted, 150 m away
- Building project by M/s. DE Blueoak and P Mangatram Properties LLP — cleared for impact study, 150 m away
- Residential Apartments Construction Project located at Plot No. 20, NEOPOLIS… — environmental approval granted, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.