Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan by M/s. Omsree Builders and Developers LLP located at Survey Nos. 188(P), 189(P) & 190(P), Kowkoor Village, Alwal Mandal, Medchal - Malkajgiri District

Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan by M/s. Omsree Builders and Developers LLP located at Survey Nos. 188(P), 189(P) & 190(P), Kowkoor Village, Alwal Mandal, Medchal - Malkajgiri District is an approved residential project in Kowkoor, Alwal, Medchal Malkajgiri, Telangana. It plans 484 units in 10 towers of up to 12 floors on 5.5 acres. Its stated project cost is ₹250 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 29 Sept 2026).

See it on the live map All projects in Medchal Malkajgiri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan by M/s. Omsree Builders and Developers LLP located at Survey Nos. 188(P), 189(P) & 190(P), Kowkoor Village, Alwal Mandal, Medchal - Malkajgiri District is an approved residential project in Kowkoor, Alwal, Medchal Malkajgiri, Telangana. It plans 484 units in 10 towers of up to 12 floors on 5.5 acres.

Who is building it?

The applicant is Omsree Builders and Developers LLP.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 29 Sept 2026), as of 27 Nov 2026.

Where is it?

In Kowkoor, Alwal, Medchal Malkajgiri, Telangana.

How big is it?

It has a stated cost of ₹250 crore and a site of 5.5 acres.

When was it filed?

The application was filed on 23 Jul 2026.

Project details

StatusEnvironmental approval granted
Status since29 Sept 2026
Application filed23 Jul 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorBuildings & townships
ApplicantOmsree Builders and Developers LLP
UseResidential
Units484
Towers10
Floors (tallest)12
Parking spaces683
Land area5.5 acres (2.2 ha)
Built-up area1,00,938 m² (10,86,487 sq ft)
Plot area22,343 m² (2,40,498 sq ft)
Project cost₹250 crore
Village / localityKowkoor
Taluk / tehsilAlwal
DistrictMedchal Malkajgiri
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03593

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 23 Jul 2026 (this page)Environmental approval granted5.5 acres₹250 crore
New project filed 20 Jun 2025Environmental approval granted5.5 acres₹110 crore

What the filings say

What is planned

Omsree Builders and Developers LLP proposes to construct Omsree Madhuvan, a gated community designed for active senior living. The project involves the construction of 484 residential apartment units across 10 blocks, including a wellness centre and various amenities.

The applicant's conceptual plan specifies the following building components:

ItemDetail
Total Built-up Area1,00,937.6 square metres
Total Units484 apartments
Total Blocks10
Maximum Floors11 above ground
Parking Capacity563 four-wheelers; 120 two-wheelers
Estimated Population2,500 to 3,000 people
Project DurationApproximately 24 months

Layout and design

The project is spread over 2.234 hectares (5.52 acres). The site layout features a central amenities area surrounded by residential blocks labeled A through H. A wellness centre is located in the southeastern portion of the site. The circulation plan includes an 8-metre wide ground floor driveway and a 5-metre wide basement driveway. The design incorporates Indian architectural principles of "Vastu."

Parking is provided in a single cellar floor and a stilt floor. The total parking area covers 26,623.4 square metres. To mitigate the urban heat island effect, the applicant proposes using cool roofs with light shades, green roofs, and pervious roads using pavers on compacted soils.

Water, power and access

The total water requirement for the project is estimated at 217.1 kilolitres per day (KLD). This will be sourced from the Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB). During the summer season, ground water sources may be used to augment the supply. The project will implement a dual plumbing system to reuse treated wastewater for flushing (65.3 KLD) and green belt development (6.1 KLD).

A sewage treatment plant (STP) with a capacity of 220 KLD will be installed using Sequencing Batch Reactor (SBR) technology. Excess treated water (89.7 KLD) will be discharged into municipal sewer lines.

Power will be drawn from the Transmission Corporation of Telangana Limited (TRANSCO). The total connected load is estimated at 2,907 kW, with a maximum demand of 3,322 kVA. Five diesel generator (DG) sets of 500 kVA each are proposed for backup. Solar energy will be utilized for fencing, street lighting, and partially for hot water in the apartments, with an estimated saving of 10.85 lakh units per year.

The site is accessed via an existing 12-metre wide road in the south, connecting to the Kowkoor main road. The nearest railway station is Bolarum, located 3.07 km away.

Environmental safeguards

The project includes a green area of 2,269.6 square metres, representing 10.15% of the site area. This will consist of avenue plantations and central greening. The applicant noted that two trees exist on the site; one will be retained on the boundary, and the other, falling within the construction footprint, will be translocated.

For storm water management, 24 rainwater harvesting pits (1.5m x 2.0m) are planned. Solid waste generation is estimated at 1,060 kg/day. This will be segregated at source into biodegradable and non-biodegradable waste. Biodegradable waste will be processed in an organic waste converter, while recyclables will be sent to authorized recyclers.

Construction and demolition waste is estimated at 5,047 tons over the two-year construction period. The applicant proposes to reuse bricks, stone slabs, and timber on-site, while rubble and broken concrete will be used for site leveling or as a sub-base for road construction.

Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan: Proposed site plan: residential blocks, wellness centre, and green areas (preview)🔒 Sign in free to see it
Proposed site plan: residential blocks, wellness centre, and green areas
Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan: Layout of the project site showing blocks A to H and central club (preview)🔒 Sign in free to see it
Layout of the project site showing blocks A to H and central club
Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan: Typical floor plan and building section showing 11 floors (preview)🔒 Sign in free to see it
Typical floor plan and building section showing 11 floors
Residential Apartments Construction Project for Active Senior Living - Omsree Madhuvan: Sewage Treatment Plant process flow diagram (SBR technology) (preview)🔒 Sign in free to see it
Sewage Treatment Plant process flow diagram (SBR technology)

In context

394 applications in Medchal Malkajgiri since January 2022 are in the same category (Buildings & townships): 300 approved, 54 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.5 acres, this one is smaller than 55% of them.

22 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kowkoor, Alwal, Medchal Malkajgiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Omsree Builders and projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.