What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Ranga Reddy, Telangana

High Rise Residential Towers comprising Towers A, B, and C with a configuration of 2 Cellars + Ground Floor + 7 Upper Floors by M/s Vinda Realty LLP

High Rise Residential Towers comprising Towers A, B, and C with a configuration of 2 Cellars + Ground Floor + 7 Upper Floors by M/s Vinda Realty LLP is a proposed residential project in Mankal, Maheshwaram, Ranga Reddy, Telangana. It plans 221 units in 4 towers of up to 11 floors on 3.3 acres. Its stated project cost is ₹180 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 20 Jul 2026).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

High Rise Residential Towers comprising Towers A, B, and C with a configuration of 2 Cellars + Ground Floor + 7 Upper Floors by M/s Vinda Realty LLP is a proposed residential project in Mankal, Maheshwaram, Ranga Reddy, Telangana. It plans 221 units in 4 towers of up to 11 floors on 3.3 acres.

Who is building it?

The applicant is Vinda Realty LLP.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Mankal, Maheshwaram, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹180 crore and a site of 3.3 acres.

When was it filed?

The application was filed on 16 Apr 2026.

Project details

Official titleProposed Construction of High Rise Residential Towers comprising Towers A, B, and C with a configuration of 2 Cellars + Ground Floor + 7 Upper Floors, along with 8th, 9th, and 10th TDR floors. In addition, an amenities block (Tower D) is proposed with a configuration of 2 Cellars + Ground Floor + 5 Upper Floors located at Survey No. 835, Mankhal Village, Maheshwaram Mandal, Ranga Reddy District, Telangana State by M/s Vinda Realty LLP
StatusUnder environmental review
Status since20 Jul 2026
Application filed16 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantVinda Realty LLP
UseResidential
Units221
Towers4
Floors (tallest)11
Basements2
Parking spaces221
Land area3.3 acres (1.4 ha)
Built-up area66,311 m² (7,13,765 sq ft)
Plot area13,517 m² (1,45,496 sq ft)
Project cost₹180 crore
Village / localityMankal
Taluk / tehsilMaheshwaram
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03595

What the filings say

What is planned

M/s. Vinda Realty LLP proposes to construct a high-rise residential project specifically designed for senior citizens aged 55 years and above. The development consists of three residential towers (A, B, and C) and one amenities block (Tower D).

The residential towers are configured with two cellars, a ground floor, and seven upper floors, plus three additional floors (8th, 9th, and 10th) under Transferable Development Rights (TDR). The amenities block, Tower D, is configured with two cellars, a ground floor, and five upper floors. The project will provide a total of 221 residential units.

Residential Unit Configuration

Tower2BHK Flats3BHK FlatsTotal Units
Tower A434386
Tower B404080
Tower C015455
Total84137221

The total built-up area for the project is 66,310.56 square metres. The residential towers (A, B, and C) account for 44,319.77 square metres, while Tower D (Amenities) covers 3,763.47 square metres. The two cellar floors for parking cover 18,227.2 square metres.

Layout and design

The project is designed on a site of 1.35 hectares (3.34 acres). The ground coverage (plinth area) is 4,009.93 square metres, representing 29.67% of the site. A green belt area of 1,502.62 square metres (11.12%) is planned, along with 1,356.62 square metres (10.04%) of open area. Internal road areas and driveways occupy 3,771.4 square metres.

Parking is provided in two cellar floors. The applicant states that the total parking area provided is 18,227.2 square metres, which exceeds the required 10,743.43 square metres under state building policy. This includes 221 spaces for four-wheelers and 450 spaces for two-wheelers.

Land and surroundings

The site is located at Survey No. 835 in Mankhal Village. It is situated 0.24 km south of the Nehru Outer Ring Road and 2.43 km northwest of Rajiv Gandhi International Airport (Shamshabad). The nearest railway station is Umdanagar, located 9.17 km to the north.

Surrounding features include the Masjid Gadda Reserve Forest 0.75 km to the south and Raviryala Lake 3.41 km to the east. The site is currently vacant with no vegetation, though it contains an existing bore well and an electrical pole.

Water, power and access

The total water requirement during the operational phase is estimated at 170 KLD. This will be met through the Tukkuguda Municipal water supply and bore wells. A dual plumbing system will be implemented to save fresh water, using 112.56 KLD of fresh water and 57.39 KLD of recycled water for flushing and landscaping. During construction, water will be sourced from Active Carbon India Private Limited via a supply agreement.

Power requirement for the project is 1,000 KVA, to be drawn from the Telangana State Southern Power Distribution Company Limited (TGSPDCL). A single 750 KVA diesel generator set will be installed for backup power. Solar panels will be installed on 10-15% of the roof area for common area lighting.

Environmental safeguards

A sewage treatment plant (STP) with a capacity of 200 KLD is proposed. Treated wastewater will be reused for flushing (57.39 KLD) and green belt irrigation (1.5 KLD), with the remainder sent to local drains. For solid waste, the project is expected to generate 785.4 kg per day. Organic waste (314.16 kg/day) will be processed in an organic waste converter for use as manure, while inorganic waste (471.24 kg/day) will be sent to waste-to-wealth centres.

Stormwater management includes 27 rainwater harvesting pits, each with a diameter of 1.2 metres and a length of 2.4 metres. The green belt will be developed with a 2-metre width around the site periphery using species such as Azadirachta indica (Neem) and Mangifera indica (Mango).

Timeline

The applicant estimates the construction phase will last approximately 60 months from the date of commencement.

Vinda Realty High Rise Residential Towers Comprising Towers A, B, and C with a Configuration of 2 Cellars + Ground Floor + 7 Upper Floors site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Vinda Realty High Rise Residential Towers Comprising Towers A, B, and C with a Configuration of 2 Cellars + Ground Floor + 7 Upper Floors: Site Plan: Residential towers, amenities block, driveways and green strips (preview)🔒 Sign in free to see it
Site Plan: Residential towers, amenities block, driveways and green strips
Vinda Realty High Rise Residential Towers Comprising Towers A, B, and C with a Configuration of 2 Cellars + Ground Floor + 7 Upper Floors: Location Map: Site context relative to Nehru Outer Ring Road and service roads (preview)🔒 Sign in free to see it
Location Map: Site context relative to Nehru Outer Ring Road and service roads
Vinda Realty High Rise Residential Towers Comprising Towers A, B, and C with a Configuration of 2 Cellars + Ground Floor + 7 Upper Floors: Tower D: Floor plans and elevation for the amenities block (preview)🔒 Sign in free to see it
Tower D: Floor plans and elevation for the amenities block
Vinda Realty High Rise Residential Towers Comprising Towers A, B, and C with a Configuration of 2 Cellars + Ground Floor + 7 Upper Floors: Sewage Treatment Plant: Sectional diagram and flow process (preview)🔒 Sign in free to see it
Sewage Treatment Plant: Sectional diagram and flow process

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.3 acres, this one is smaller than 70% of them.

68 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mankal, Maheshwaram, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.