One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of API (Bulk drug and intermediates) manufacturing unit at Plot. Nos. 43, 44…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 30 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Chromo laboratories India Private limited |
| Land area | 2.3 acres (1 ha) |
| Project cost | ₹74 crore |
| Village / locality | Pashamylaram |
| Taluk / tehsil | Patancheru |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03625 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Jun 2026 (this page) | Under environmental review | 2.3 acres | ₹74 crore |
| Early planning filed 24 Nov 2025 | Cleared for impact study | 2.3 acres | ₹74 crore |
In context
85 applications in Sangareddy since January 2022 are in the same category (Industry): 55 approved, 18 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 2.3 acres, this one is smaller than 86% of them.
72 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pashamylaram, Patancheru, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of API (Bulk drug and intermediates) manufacturing unit at Plot.… — cleared for impact study, 0 m away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs) and… — environmental approval granted, 200 m away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs) and… — cleared for impact study, 200 m away
- Request to change the name of company in existing Environmental Clearance for… — environmental approval granted, 300 m away
- Request to change the name of company in existing Environmental Clearance for… — lapsed, 300 m away
- Request to change the name of company in existing Environmental Clearance for… — returned to applicant, 300 m away
- Industrial project by M/s. Sreeni Labs Private Limited — environmental approval granted, 350 m away
- Amendment in existing EC for inclusion of additional DG sets to existing… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.