Quick answers
What is this project?
Residential Apartments Construction Project by M/s. DSR Infrastructure Private Limited located at Survey No. 46 Part, Gachibowli, Serilingampally Mandal, Ranga Reddy District is a lapsed building project in Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The site covers 2.6 acres.
Who is building it?
The applicant is DSR Infrastructure Private Limited.
Has it been approved?
No. The application was lapsed on 21 Jul 2026, so it is no longer under consideration.
Where is it?
In Serilingampalli, Serilingampally, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹142 crore and a site of 2.6 acres.
When was it filed?
The application was filed on 9 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Jul 2026 |
| Application filed | 9 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | DSR Infrastructure Private Limited |
| Land area | 2.6 acres (1 ha) |
| Project cost | ₹142 crore |
| Village / locality | Serilingampalli |
| Taluk / tehsil | Serilingampally |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03667 |
In context
882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.6 acres, this one is smaller than 75% of them.
255 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Serilingampalli, Serilingampally, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed enhancement of built-up area of IT / ITES office complex : Sy. No. #… — environmental approval granted, 300 m away
- Proposed enhancement of built-up area of IT / ITES office complex : Sy. No. #… — cleared for impact study, 300 m away
- Amendment to TOR & Environmental clearance issued - Proposed construction… — more information requested, 300 m away
- Proposed Multi Storied Office Building at Gachibowli, Serilingampalli -… — initial checks, 450 m away
- Modification of Raidurg IT Office Tower Blocks for Transit Oriented… — environmental approval granted, 650 m away
- Expansion of Environmental Clearance for the Mixed-Use Development Project… — environmental approval granted, 650 m away
- Expansion of Environmental Clearance for the Mixed-Use Development Project… — cleared for impact study, 650 m away
- Proposed Amalgamation & Amendment to Environmental Clearances of Mixed Use… — environmental approval granted, 650 m away
All 3 DSR Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.