What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Ranga Reddy, Telangana

Student Housing Construction Project located at Survey nos. 134 and 135, Mamidipally Village, Shamshabad Mandal, Ranga Reddy district Telangana by M/s GMR Hyderabad Aviation SEZ Limited

Student Housing Construction Project located at Survey nos. 134 and 135, Mamidipally Village, Shamshabad Mandal, Ranga Reddy district Telangana by M/s GMR Hyderabad Aviation SEZ Limited is a proposed building project in Mamidipalli, Saroornagar, Ranga Reddy, Telangana. The site covers 2.2 acres. Its stated project cost is ₹161.9 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 12 Nov 2026).

See it on the live map All projects in Ranga Reddy

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Student Housing Construction Project located at Survey nos. 134 and 135, Mamidipally Village, Shamshabad Mandal, Ranga Reddy district Telangana by M/s GMR Hyderabad Aviation SEZ Limited is a proposed building project in Mamidipalli, Saroornagar, Ranga Reddy, Telangana. The site covers 2.2 acres.

Who is building it?

The applicant is GMR Hyderabad Aviation SEZ Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Mamidipalli, Saroornagar, Ranga Reddy, Telangana.

How big is it?

It has a stated cost of ₹161.9 crore and a site of 2.2 acres.

When was it filed?

The application was filed on 22 Sept 2026.

Project details

StatusUnder environmental review
Status since12 Nov 2026
Application filed22 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantGMR Hyderabad Aviation SEZ Limited
Land area2.2 acres (0.9 ha)
Project cost₹161.9 crore
Village / localityMamidipalli
Taluk / tehsilSaroornagar
DistrictRanga Reddy
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-03800

In context

882 applications in Ranga Reddy since January 2022 are in the same category (Buildings & townships): 667 approved, 107 filed or under review, and 108 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.2 acres, this one is smaller than 79% of them.

46 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mamidipalli, Saroornagar, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.