Quick answers
What is this project?
Diversion of 0.3535 Ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Compartment No:21,27 Muralipad Beat & Compartment No:30 of Koppurai Beat, Chatakonda RF, in Tekulapally Range in Kothagudem Division is a proposed telecom project in Koppurai, Tekulapalli, Bhadradri Kothagudem, Telangana. The site covers 0.9 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Koppurai, Tekulapalli, Bhadradri Kothagudem, Telangana.
How big is it?
It has a stated cost of ₹22 lakh; a site of 0.9 acres and 3,540 m² of forest land.
When was it filed?
The application was filed on 31 Jul 2026.
Project details
| Official title | Diversion of 0.3535 Ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Compartment No:21,27 Muralipad Beat & Compartment No:30 of Koppurai Beat, Chatakonda RF, in Tekulapally Range in Kothagudem Division in Bhadradri Kothagudem District Telangana State in favour of Bharti Airtel Limited." |
|---|---|
| Status | Initial checks |
| Status since | 31 Jul 2026 |
| Application filed | 31 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 3,500 m² |
| Forest land | 3,540 m² |
| Project cost | ₹22 lakh |
| Village / locality | Koppurai |
| Taluk / tehsil | Tekulapalli |
| District | Bhadradri Kothagudem |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03876 |
In context
15 applications in Bhadradri Kothagudem since January 2022 are in the same category (Telecom): 2 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.9 acres, this one is larger than 50% of them.
Where it is
Koppurai, Tekulapalli, Bhadradri Kothagudem, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Koyagudem Opencast-II (KOC-II) Expansion Project — environmental approval granted, 8.5 km away
- Diversion of 0.9465 Ha of Forest Land and (1.4904 ha Non Forest land &… — initial checks, 9 km away
- Road from Mylaram to Gundala R and B Road via Rayagudem — application filed, 10.2 km away
- Diversion of 0.2079 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 10.4 km away
- Regularisation of 16.11 Ha of Maintainance of Safety Zone Area of 7.5 Mts… — lapsed, 11.8 km away
- Bt Road From Allapally to Venkatapuram Road From Km 0/0 to 10/600 — more information requested, 12.1 km away
- Diversion of 3.2127 Ha of Forest Land for Construction of Bt Road From… — application filed, 12.8 km away
- Diversion of 3.2127 Ha of Forest Land for Construction of Bt Road From… — initial checks, 12.8 km away
More from Bharti Airtel Limited in Bhadradri Kothagudem
- Diversion of 0.9465 Ha of Forest Land and (1.4904 ha Non Forest land &… — initial checks
- Diversion of 0.501 Ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved
- Diversion of 0.11 Ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved
4 Bharti Airtel (Airtel) projects in Bhadradri Kothagudem
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.