Quick answers
What is this project?
Diversion of 1.4614 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Arsikota, Balpalagandi, Bheemgal, Ibrahimpatnam, Mutaplly, Potharam and Yardandy RF of Jagtial Division is a rejected telecom project in Alur, Raikal, Jagitial, Telangana. The site covers 3.6 acres.
Who is building it?
The applicant is Telangana Fiber Grid Corporation Limited.
Has it been approved?
No. The application was rejected on 28 Oct 2026.
Where is it?
In Alur, Raikal, Jagitial, Telangana.
How big is it?
It has a stated cost of ₹33 lakh; a site of 3.6 acres and 3.6 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 14 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 1.4614 ha of Forest Land for laying of Optical Fiber Cable along the road…
Project details
| Official title | Diversion of 1.4614 ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Arsikota, Balpalagandi, Bheemgal, Ibrahimpatnam, Mutaplly, Potharam and Yardandy RF of Jagtial Division in Jagtial District, Telangana State in favour of Telangana Fiber Grid Corporation Ltd. |
|---|---|
| Status | Approval revoked |
| Status since | 28 Oct 2026 |
| Application filed | 14 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Telangana Fiber Grid Corporation Limited |
| Land area | 3.6 acres (1.5 ha) |
| Forest land | 3.6 acres (1.5 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Alur |
| Taluk / tehsil | Raikal |
| District | Jagitial |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03935 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Aug 2024 | Forest land use approved | 3.6 acres | ₹33 lakh |
| New project filed 14 Jun 2023 (this page) | Approval revoked | 3.6 acres | ₹33 lakh |
Where it is
Alur, Raikal, Jagitial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.4614 ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved, 0 m away
- Remodeling for Increasing the Capacity of Rollavagu Tank by Raising Down… — more information requested, 9.8 km away
- Remodeling for Increasing the Capacity of Rollavagu Tank by Raising Down… — more information requested, 9.8 km away
- The Diversion of 0.6384 Ha of Forest Land for Laying of Optical Fiber Cable… — forest land use approved, 10.5 km away
- Sri Subedari Manohar — lapsed, 14.7 km away
- Four-Lane Highway Armoor -Jagtial -Mancherial section of NH-63 (from km 29+100… — environmental approval granted, 15 km away
- Sri. Kasuganti Arun Kumar — environmental approval granted, 16.3 km away
- Diversion of 0.377 Ha of Forest Land — lapsed, 17.5 km away
All 79 Telangana Fiber Grid Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.