Quick answers
What is this project?
Diversion of Forest Land for construction of approach road with BT to Lemoor from Km 24/5 of Hyderabad - Srisailam road is a proposed road project in Lemur, Kandukur, Ranga Reddy, Telangana. The site covers 2.4 acres.
Who is building it?
The applicant is Dist Pr Engineer, Piu Rr Dist.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Lemur, Kandukur, Ranga Reddy, Telangana.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 22 Dec 2024.
Project details
| Official title | Diversion of Forest Land for construction of approach road with BT to Lemoor from Km 24/5 of Hyderabad - Srisailam road in Kandukur (M) of RR District- in favour of Dist PR Engineer, PIU Rangareddy. |
|---|---|
| Status | More information requested |
| Status since | 13 Nov 2026 |
| Application filed | 22 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Dist Pr Engineer, Piu Rr Dist |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Lemur |
| Taluk / tehsil | Kandukur |
| District | Ranga Reddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03959 |
In context
20 applications in Ranga Reddy since January 2022 are in the same category (Roads & highways): 2 approved, 6 filed or under review, and 12 withdrawn, lapsed or rejected. At 2.4 acres, this one is larger than 70% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lemur, Kandukur, Ranga Reddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Villas with Clubhouse Construction Project located at Survey Nos.… — environmental approval granted, 1.4 km away
- Change of Product Mix on the Basis of "no Increase in Pollution Load" of M/S.… — initial checks, 2.3 km away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs), API… — environmental approval granted, 2.4 km away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs), API… — cleared for impact study, 2.4 km away
- Residential Layout by M/s. Sukhii Infra Private Limited — environmental approval granted, 2.7 km away
- Residential Buildings by M/s Sukhii Infra Private Limited — withdrawn, 2.7 km away
- Smt. Gullapudi Renuka And Others represented by its DAGPA Holder M/s.Aadya… — environmental approval granted, 2.8 km away
- Proposed Group Housing project named "Red Fern" by M/s. Praneeth Infra… — lapsed, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.