Quick answers
What is Diversion of Forest Land?
Diversion of Forest Land is a proposed road project in Chella Samudram, Yellandu, Bhadradri Kothagudem, Telangana. The site covers 26.2 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chella Samudram, Yellandu, Bhadradri Kothagudem, Telangana.
How big is it?
It has a stated cost of ₹674.9 crore; a site of 26.2 acres and 26.1 acres (10.6 ha) of forest land.
When was it filed?
The application was filed on 30 Nov 2024.
Project details
| Official title | Diversion of Forest Land in Mahabubabad District for Rehabilitation and Up Gradation of Thorrur to Nehru Nagar Section to Two Lane With Paved Shoulders From Km 109/420 to 178/500 of NH 930p in the State of Telangana on Epc Mode Under Annual Plan 2022-23 |
|---|---|
| Status | More information requested |
| Status since | 25 Jun 2026 |
| Application filed | 30 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 26.2 acres (10.6 ha) |
| Forest land | 26.1 acres (10.6 ha) |
| Project cost | ₹674.9 crore |
| Village / locality | Chella Samudram |
| Taluk / tehsil | Yellandu |
| District | Bhadradri Kothagudem |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04032 |
In context
21 applications in Bhadradri Kothagudem since January 2022 are in the same category (Roads & highways): 0 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. At 26.2 acres, this one is larger than 87% of them.
Where it is
Chella Samudram, Yellandu, Bhadradri Kothagudem, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Additional Forest Land of 17.5113 Ha for Jkocp in Addition to the… — more information requested, 12.5 km away
- Regularisation of 0.6 Ha of Maintainance of Safety Zone Area of 7.5 Mts Strip… — lapsed, 12.5 km away
- JAWAHAR KHANI OPENCAST MINE [Amalgamation of JK-5 OC and 21 Incline(Conversion… — environmental approval granted, 13.5 km away
- JAWAHAR KHANI OPENCAST MINE [Amalgamation of JK-5 OC and 21 Incline(Conversion… — returned to applicant, 13.5 km away
- JAWAHAR KHANI OPENCAST MINE [Amalgamation of JK-5 OC and 21 Incline(Conversion… — cleared for impact study, 13.5 km away
- Diversion of 0.2916 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 15.7 km away
- Diversion of 0.0204 Ha forest land for Construction of 4G Mobile tower under… — forest land use approved, 16.9 km away
- Diversion of 0.1103 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 18.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.