Quick answers
What is this project?
Laying of Drinking Water pipeline project of Balance Work of Construction of Intake Structure, WTP and pipeline for Four HMW Segments - Sri Komaravelli Mallanna Sagar as Source is a lapsed pipeline project in Ghanapur, Medchal, Medchal Malkajgiri, Telangana. The site covers 1.2 acres.
Who is building it?
The applicant is Mission Bhagiratha.
Has it been approved?
No. The application was lapsed on 19 Feb 2025, so it is no longer under consideration.
Where is it?
In Ghanapur, Medchal, Medchal Malkajgiri, Telangana.
How big is it?
It has a stated cost of ₹21 crore; a site of 1.2 acres and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 2 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Feb 2025 |
| Application filed | 2 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Mission Bhagiratha |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹21 crore |
| Village / locality | Ghanapur |
| Taluk / tehsil | Medchal |
| District | Medchal Malkajgiri |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04043 |
In context
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghanapur, Medchal, Medchal Malkajgiri, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Balance work of Construction of Intake Structure, WTP and Pipelines for Four… — forest land use approved, 500 m away
- Approach Road Connecting the Rajivgandhi State High Way to Agricultural Land… — lapsed, 700 m away
- Diversion of 0.272 Ha of Forest Land in Lalgadimalakpet Rf of Medchal Forest… — lapsed, 700 m away
- Building project by M/s. Genotex International Private Limited — under environmental review, 1.8 km away
- Building project by M/s. Genotex international Private Limited — lapsed, 1.8 km away
- Warehouse/Logistics/Assembling/Industrial/Construction Project by Sri. Ramesh… — environmental approval granted, 2 km away
- Moulana Abdul Kalam Azad Hyderabad Srujala Sravanthi Scheme Phase I — more information requested, 2 km away
- Residential Apartments Construction project - WINSOME by M/s. Incredible India… — environmental approval granted, 2.4 km away
More from Mission Bhagiratha in Medchal Malkajgiri
- Re-Diversion of 0.1008 Ha Forest Land for Laying of Water Pipeline and… — initial checks
- Balance work of Construction of Intake Structure, WTP and Pipelines for Four… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.