Project details
| Status | Forest land use approved |
|---|---|
| Status since | 4 Aug 2026 |
| Application filed | 5 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 3,800 m² |
| Forest land | 3,760 m² |
| Project cost | ₹47 lakh |
| Village / locality | Illaram |
| Taluk / tehsil | Kannepally |
| District | Mancherial |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04056 |
In context
16 applications in Mancherial since January 2022 are in the same category (Telecom): 3 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected. At 0.9 acres, this one is smaller than 70% of them.
Where it is
Illaram, Kannepally, Mancherial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 500 KLPD Grain Based Distillery to produce Ethanol under EBP Programme by M/s.… — lapsed, 7.2 km away
- Amendment in Environmental Clearance of 500 KLPD Grain based Ethanol Plant for… — environmental approval granted, 7.2 km away
- 500 KLPD Grain Based Distillery to produce Ethanol under EBP Programme by M/s.… — environmental approval granted, 7.2 km away
- Assistant Director of Mines and Geology - Mancherial -1.0 Ha — environmental approval granted, 7.8 km away
- Kalyan Khani OCP — environmental approval granted, 10.7 km away
- Kasipet-1 Incline Underground Coal Mine Project — environmental approval granted, 11.2 km away
- Telangana Education and Welfare Infrastructure Development Corporation of… — initial checks, 12.3 km away
- Regularization of Safety Zone Area to an Extent of 5.11 Ha for Maintenance of… — more information requested, 12.6 km away
More from Jio Digital Fiber Private Limited in Mancherial
- Laying of Optical Fibre Cable Between Ghot-Chennur Along the Road Within the… — under wildlife review
- Laying of Optical Fibre Cable Between Ghot-Chennur Along the Road Within the… — lapsed
- Laying of Optical Fibre Cable Between Nirmal Kammepally along the road within… — decision issued
- Laying of Optical Fibre Cable Between Nirmal Kammepally along the road within… — forest land use approved
- Laying of Optical Fibre Cable between Budhakalan-Ponnaram along the road… — forest land use approved
- Laying of Optical Fibre Cable Between Mancherial to Rallygadpur long the road… — more information requested
8 Jio Digital Fibre projects in Mancherial
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.