Project details
| Official title | Proposal for diversion of 0.1782 ha of Forest Land and (0.0905 ha of Non Forest land Total :0.2687 ha) for laying of Optical Fiber Cable along the road within the existing ROW in Compt No: 333 & 336 in Nallavally, Gummadidala Beat, Nallavally & Mamdapur RF in Sangareddy Range of Sangareddy Division in Sangareddy District of Telangana State in favour of Dinesh Engineers Limited. |
|---|---|
| Status | More information requested |
| Status since | 6 Oct 2026 |
| Application filed | 31 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Dinesh Engineers Limited |
| Land area | 2,700 m² |
| Forest land | 1,780 m² |
| Project cost | ₹13 lakh |
| Village / locality | Gummadidala |
| Taluk / tehsil | Gummadidala |
| District | Sangareddy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04058 |
In context
6 applications in Sangareddy since January 2022 are in the same category (Telecom): 2 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gummadidala, Sangareddy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land in Mumbapur Rf Block of Sangareddy District for… — more information requested, 1 km away
- 10.00 Ha of Stone & Metal and Fullers Earth Quarry of M/s Parameswari Minerals… — environmental approval granted, 3.6 km away
- Transfer of Environmental Clearance from M/s Clininvent Research Private… — environmental approval granted, 3.8 km away
- Transfer of Environmental Clearance for the Bulk Drug Unit project at Sy. No.:… — environmental approval granted, 3.8 km away
- Change of Product Mix on the Basis of No Increase in Pollution Load and… — initial checks, 3.8 km away
- Project by M/s. Clariant India Private Limited. (Formerly M/s. Clariant India… — initial checks, 4.6 km away
- Change of Product Mix on the Basis of No Increase in Pollution Loads and… — initial checks, 4.6 km away
- Rolling mill for manufacturing of M.S. CTD Bars/TMT Bars/ M.S. Rounds of… — cleared for impact study, 4.9 km away
All 31 Dinesh Engineers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.