Quick answers
What is this project?
Diversion of 0.2710 ha of Forest Land for Execution of T -Fiber Project towards laying of Optical Fiber Cable along the road within the existing ROW in Wanaparthy Division, Wanaparthy District, of Telangana State is an approved telecom project in Wanparti, Wanaparthy, Telangana. The site covers 0.7 acres.
Who is building it?
The applicant is Telangana Fiber Grid Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 Oct 2024), as of 27 Nov 2026.
Where is it?
In Wanparti, Wanaparthy, Telangana.
How big is it?
It has a stated cost of ₹22 lakh; a site of 0.7 acres and 2,710 m² of forest land.
When was it filed?
The application was filed on 19 Apr 2023.
Project details
| Official title | Diversion of 0.2710 ha of Forest Land for Execution of T -Fiber Project towards laying of Optical Fiber Cable along the road within the existing ROW in Forest Land in Wanaparthy Division, Wanaparthy District, of Telangana State. |
|---|---|
| Status | Forest land use approved |
| Status since | 1 Oct 2024 |
| Application filed | 19 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Telangana Fiber Grid Corporation Limited |
| Land area | 2,700 m² |
| Forest land | 2,710 m² |
| Project cost | ₹22 lakh |
| Village / locality | Wanparti |
| Taluk / tehsil | Wanaparthy |
| District | Wanaparthy |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04067 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wanparti, Wanaparthy, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Neelam Builders & Developers — environmental approval granted, 2.8 km away
- Diversion of 7.1166 ha of forest land in Wanaparthy Division for construction… — lapsed, 4.1 km away
- Diversion of the Forest Land for Construction of Bypass Road to Wanaparthy… — lapsed, 5.3 km away
- Diversion of 0.3548 Ha of Forest Land in Wanaparthy Division for Laying of… — lapsed, 6.3 km away
- Diversion of 0.1485 Ha for setup for Bus Shelter, Water Tank and Mini… — lapsed, 6.7 km away
- Earth Work Excavation and Construction of Cm and Cd Works From Km 0.000 to Km… — under forest review, 6.9 km away
- Smt. Konkali Padma — environmental approval granted, 8.4 km away
- Smt. K. Veena Reddy — environmental approval granted, 8.7 km away
All 79 Telangana Fiber Grid Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.