Laying of MS Pressure main in the place of Existing Damaged PSC Pressure Main and Repairs to pumps and Motors of the Nakkagudem L.I Scheme is a lapsed pipeline project in Chintriyal, Chinthalapalem, Suryapet, Telangana. The site covers 0.5 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
No. The application was lapsed on 9 Mar 2026, so it is no longer under consideration.
Where is it?
In Chintriyal, Chinthalapalem, Suryapet, Telangana.
How big is it?
It has a stated cost of ₹37.7 crore; a site of 0.5 acres and 1,980 m² of forest land.
When was it filed?
The application was filed on 24 Jan 2026.
Project details
| Official title | Laying of MS Pressure main in the place of Existing Damaged PSC Pressure Main and Repairs to pumps and Motors of the Nakkagudem L.I Scheme at Chinthalaplem (M) of Suryapet District. |
|---|---|
| Status | Lapsed |
| Status since | 9 Mar 2026 |
| Application filed | 24 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Department of Irrigation |
| Land area | 2,000 m² |
| Forest land | 1,980 m² |
| Project cost | ₹37.7 crore |
| Village / locality | Chintriyal |
| Taluk / tehsil | Chinthalapalem |
| District | Suryapet |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04130 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jan 2026 (this page) | Lapsed | 0.5 acres | ₹37.7 crore |
| New project filed 13 Oct 2025 | Lapsed | 0.5 acres | ₹37.7 crore |
In context
6 applications in Suryapet since January 2022 are in the same category (Pipelines): 0 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Chintriyal, Chinthalapalem, Suryapet, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of MS Pressure main in the place of Existing Damaged PSC Pressure Main… — lapsed, 0 m away
- M/s NCL Industries Limited-Gundlapalli Limestone Mine — lapsed, 7.9 km away
- Sri. Dasari Naga Vara Prasad — environmental approval granted, 8.7 km away
- Sri Dasari Naga Vara Prasad, was obtained in principle quarry lease in… — lapsed, 8.7 km away
- Proposed Mosaic Chips Quarry of M/s. Sri Suryachandra Minerals — environmental approval granted, 8.8 km away
- Transfer of Environment Clearance Letter No. EC23B001TG131899 from M/s. Sri… — environmental approval granted, 8.8 km away
- Proposed 2x150 MW Thermal Power Project by M/s Mecwel Power Private Limited — lapsed, 10 km away
- EC Extension for the proposed 300 MW (2 X 150 MW) Coal based Thermal Power… — lapsed, 10 km away
More from Department of Irrigation in Suryapet
- Formulation of Lift Irrigation Scheme to Janpadu branch canal from Krishna… — under forest review
- Formulation of Lift Irrigation Scheme to Janpadu branch canal from Krishna… — lapsed
- Formulation of Lift Irrigation Scheme to Janpadu branch canal from Krishna… — lapsed
- Formulation of Lift Irrigation Scheme To Mukthyala Branch Canal From Krishna… — lapsed
- Formulation of Lift Irrigation Scheme to Janpadu branch canal from Krishna… — lapsed
- Formulation of Lift Irrigation Scheme to Janpadu branch canal from Krishna… — lapsed
9 Department of Irrigation, Telangana projects in Suryapet
All 24 Department of Irrigation, Telangana projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.