One of 2 filings for this project. The project's main page, with every filing and where each stands: Bt Road From Parpally to Kavarakothapally Road From Km 0/0 to 5/00
Project details
| Official title | Construction of Bt Road From Parpally to Kavarakothapally Road From Km 0/0 to 5/00 in Kotapally Mandal of Mancherial District |
|---|---|
| Status | Lapsed |
| Status since | 17 Oct 2025 |
| Application filed | 27 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Rb Mancherial |
| Land area | 5 acres (2 ha) |
| Forest land | 5 acres (2 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Kawarkottapalli |
| Taluk / tehsil | Kotapally |
| District | Mancherial |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04175 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 May 2025 (this page) | Lapsed | 5 acres | ₹4.1 crore |
| New project filed 9 Sept 2024 | Under wildlife review | 5 acres | ₹4.1 crore |
In context
23 applications in Mancherial since January 2022 are in the same category (Roads & highways): 3 approved, 9 filed or under review, and 10 withdrawn, lapsed or rejected. At 5 acres, this one is smaller than 55% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kawarkottapalli, Kotapally, Mancherial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bt Road From Parpally to Kavarakothapally Road From Km 0/0 to 5/00 — under wildlife review, 0 m away
- Laying of Optical Fibre Cable Between Ghot-Chennur Along the Road Within the… — under wildlife review, 2 km away
- Laying of Optical Fibre Cable Between Ghot-Chennur Along the Road Within the… — lapsed, 2 km away
- Bt Road From Rajaram to Babberachikuka Road From Km 0/0 to 3/00 — lapsed, 4.1 km away
- BT road from Racherla to Arjunagutta via vechally, Royalapally, Sirsa, Annaram — lapsed, 8.5 km away
- Diversion Of 5.0757 Ha of Forest Land proposal for Laying of Optical Fiber… — under wildlife review, 8.6 km away
- Diversion of 0.8690 ha of Forest Land for laying of Optical Fiber Cable(OFC)… — lapsed, 9.6 km away
- Diversion Of 5.0757 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 9.6 km away
More from Executive Engineer Rb Mancherial in Mancherial
- BT road from Bopparam to Algaon road from Km.0/0 to 5/680 — lapsed
- Bt Road From Rajaram to Babberachikuka Road From Km 0/0 to 3/00 — lapsed
- BT road from Racherla to Arjunagutta via vechally, Royalapally, Sirsa, Annaram — lapsed
- BT Road from Mallampet to Nakkalapally from Km.0/0 to 6/0 — lapsed
- BT Road from Vemanpally to Chinnaraspally via Nagara, Lingala, Etapally up to… — lapsed
- Bt Road From Vemanapally to Kammargoan Via Samputam, Kallampally, Ravulapally,… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.