One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 1.5953 Ha of Forest Land for laying of Optical Fiber Cable along the road…
Project details
| Official title | Diversion of 1.5953 Ha of Forest Land for laying of Optical Fiber Cable along the road within the existing ROW in Forest Land in Kawai RF of Jannaram Division in Mancherial District, Telangana State in favour of Telangana Fiber Grid Corporation LTD. |
|---|---|
| Status | Lapsed |
| Status since | 9 Mar 2025 |
| Application filed | 18 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Telangana Fiber Grid Corporation Limited |
| Forest land | 3.9 acres (1.6 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Bommena |
| Taluk / tehsil | Jannaram |
| District | Mancherial |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04187 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Aug 2023 (this page) | Lapsed | ₹55 lakh | |
| New project filed 28 Jun 2023 | Under wildlife review | ₹55 lakh |
In context
16 applications in Mancherial since January 2022 are in the same category (Telecom): 3 approved, 4 filed or under review, and 9 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bommena, Jannaram, Mancherial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.5953 Ha of Forest Land for laying of Optical Fiber Cable along… — under wildlife review, 0 m away
- R&B Road to Puttiguda — more information requested, 2.2 km away
- Diversion of 1.5953 Ha of Forest Land proposal for laying of Optical Fiber… — more information requested, 2.8 km away
- Diversion of 1.5953 Ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review, 2.8 km away
- Laying of Optical Fibre Cable Between Nirmal Kammepally along the road within… — decision issued, 3.9 km away
- Laying of Optical Fibre Cable Between Nirmal Kammepally along the road within… — forest land use approved, 3.9 km away
- Diversion of 0.021 Ha forest land for Construction of 4G Mobile tower under… — lapsed, 5.4 km away
- Diversion of 0.021 Ha forest land for Construction of 4G Mobile tower under… — more information requested, 5.4 km away
More from Telangana Fiber Grid Corporation Limited in Mancherial
- "Diversion of 2.1997 Ha of Forest Land and (3.8810 Ha Non-Forest Land and… — more information requested
- Diversion Of 2.1837 ha revised from 2.2958 Ha of Forest Land proposal for… — more information requested
- Diversion of 1.5953 Ha of Forest Land proposal for laying of Optical Fiber… — more information requested
- Diversion Of 2.1997 Ha of Forest Land proposal for Laying of Optical Fiber… — not approved
- Diversion Of 5.0757 Ha of Forest Land proposal for Laying of Optical Fiber… — under wildlife review
- Diversion of 1.5953 Ha of Forest Land proposal for laying of Optical Fiber… — under wildlife review
13 Telangana Fiber Grid Corporation projects in Mancherial
All 79 Telangana Fiber Grid Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.