Quick answers
What is this project?
Diversion of Forest Land to an Extent of 0.3073 Ha in Aswaraopet-1 Rf and Vendanthapuram Rf of Paloncha Forest Division Under Bhadradi - Kothagudem District for Laying of Ofc Cables Along the Aswaraopet to Bhadrachalam Route Road and Within the Existing Right of Way in Favour of M/S Vindhya Telelinks Limited is a rejected telecom project in Ashwarapeta, Aswaraopeta, Bhadradri Kothagudem, Telangana. The site covers 0.8 acres.
Who is building it?
The applicant is M/S Vindhya Telelinks Limited.
Has it been approved?
No. The application was rejected on 26 May 2025.
Where is it?
In Ashwarapeta, Aswaraopeta, Bhadradri Kothagudem, Telangana.
How big is it?
It has a stated cost of ₹31 lakh; a site of 0.8 acres and 3,070 m² of forest land.
When was it filed?
The application was filed on 12 Oct 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land to an Extent of 0.3073 Ha in Aswaraopet-1 Rf and Vendanthapuram…
Project details
| Status | Not approved |
|---|---|
| Status since | 26 May 2025 |
| Application filed | 12 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | M/S Vindhya Telelinks Limited |
| Land area | 3,100 m² |
| Forest land | 3,070 m² |
| Project cost | ₹31 lakh |
| Village / locality | Ashwarapeta |
| Taluk / tehsil | Aswaraopeta |
| District | Bhadradri Kothagudem |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04233 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Aug 2025 | In-principle approval, conditions pending | 0.8 acres | ₹31 lakh |
| New project filed 12 Oct 2023 (this page) | Not approved | 0.8 acres | ₹31 lakh |
In context
15 applications in Bhadradri Kothagudem since January 2022 are in the same category (Telecom): 2 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.8 acres, this one is smaller than 67% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ashwarapeta, Aswaraopeta, Bhadradri Kothagudem, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Sri Luxmi Tulasi Agro Paper (P) Ltd. — initial checks, 3.7 km away
- Diversion of Forest Land to an Extent of 0.3073 Ha in Aswaraopet-1 Rf and… — in-principle approval, conditions pending, 4.7 km away
- Smt. Midiyam Rajamma Alias Ramulamma — environmental approval granted, 16.2 km away
- Diversion of 0.11 Ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved, 25.6 km away
- Diversion of 0.501 Ha of Forest Land for laying of Optical Fiber Cable along… — forest land use approved, 43.5 km away
- Sri. Islavath Prasad — environmental approval granted, 55.2 km away
- Diversion of 2.5937 Hectores of Forest Land in Bhadrachalam Division for the… — lapsed, 55.6 km away
- Sri. Irpa Venkateswarlu — environmental approval granted, 56.6 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.