Quick answers
What is this project?
Diversion of 1.2018 Ha Forest land for improvement of existing road by widening and providing BT Road from Gunjed to Dubbaguda (Kothaguda to Dubbaguda from 0/0 to 40/0 via Ladaigadda, Musmi, Karnagandi, Kamaram, Ponugondla, Ramaram, Lingala and Mamidigudem) is a lapsed road project in Lingala, Tadvai, Mulugu, Telangana. The site covers 3 acres.
Who is building it?
The applicant is Roads and Buildings Department.
Has it been approved?
No. The application was lapsed on 13 Aug 2024, so it is no longer under consideration.
Where is it?
In Lingala, Tadvai, Mulugu, Telangana.
How big is it?
It has a stated cost of ₹3 crore; a site of 3 acres and 3 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 19 Aug 2023.
Project details
| Official title | Diversion of 1.2018 Ha Forest land for improvement of existing road by widening and providing BT Road from Gunjed to Dubbaguda (Kothaguda to Dubbaguda from 0/0 to 40/0 via Ladaigadda, Musmi, Karnagandi, Kamaram, Ponugondla, Ramaram, Lingala and Mamidigudem) in Mahabubabad district Passing through Tadwai Forest Division, Mulugu District, Telangana State. |
|---|---|
| Status | Lapsed |
| Status since | 13 Aug 2024 |
| Application filed | 19 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Roads and Buildings Department |
| Land area | 3 acres (1.2 ha) |
| Forest land | 3 acres (1.2 ha) |
| Project cost | ₹3 crore |
| Village / locality | Lingala |
| Taluk / tehsil | Tadvai |
| District | Mulugu |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04281 |
In context
18 applications in Mulugu since January 2022 are in the same category (Roads & highways): 0 approved, 10 filed or under review, and 7 withdrawn, lapsed or rejected. At 3 acres, this one is smaller than 60% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lingala, Tadvai, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 2.0175 ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 650 m away
- Diversion of 11.641 Ha of Forest land for improvement of existing road by… — lapsed, 8.3 km away
- Preliminary exploration for Coal in Alligudem Sector, Central part of Godavari… — not approved, 9.8 km away
- Diversion of 0.0401 Ha of Forest Land for Construction of Mobile Tower under… — lapsed, 11.9 km away
- Diversion of 1.8850 Ha revised from 2.0175 ha of Forest Land for laying of… — more information requested, 17.5 km away
- Diversion of 1.7923 Ha — more information requested, 20.2 km away
- Diversion of 0.167Ha of Forest Land for Laying of Underground OFC cable under… — lapsed, 20.3 km away
- Diversion of 2.69 Ha — more information requested, 21.2 km away
More from Roads and Buildings Department in Mulugu
All 36 Roads and Buildings Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.