Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Nov 2023 |
| Application filed | 12 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers Limited |
| Land area | 300 m² |
| Forest land | 350 m² |
| Project cost | ₹25 lakh |
| Village / locality | Pangidimadra |
| Taluk / tehsil | Tiryani |
| District | Kumuram Bheem Asifabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04350 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jul 2023 | More information requested | 0.1 acres | ₹25 lakh |
| New project filed 12 May 2023 (this page) | Lapsed | 0.1 acres | ₹25 lakh |
In context
17 applications in Kumuram Bheem Asifabad since January 2022 are in the same category (Telecom): 3 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.
Where it is
Pangidimadra, Tiryani, Kumuram Bheem Asifabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0346 Ha of Forest Land for Construction of Mobile Tower under… — more information requested, 0 m away
- Conversion of Existing Single Phase Supply to 3-Phase Supply in Gondapur St… — application filed, 5.4 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply in Dongergaon St… — application filed, 5.4 km away
- Conversion of Existing Single Phase Supply to 3-Phase Supply in Geesiguda St… — application filed, 5.5 km away
- Diversion of 0.6297 Ha of Forest Land in Asifabad Wl Forest Division for… — lapsed, 5.6 km away
- Diversion of 0.046 Ha forest land for Construction of 4G Mobile tower and OFC… — forest land use approved, 5.9 km away
- Diversion of 0.046 Ha forest land for Construction of 4G Mobile tower and OFC… — decision issued, 5.9 km away
- Diversion of 0.9770 Ha of Forest Land for LWE Phase-II Projects falling in… — forest land use approved, 6.2 km away
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.