One of 2 filings for this project. The project's main page, with every filing and where each stands: BT Road from PWD Road to Yelkapalli (Yelkapalli to Salugupalli) from km 0/0 to 15/0…
Project details
| Official title | Construction of BT Road from PWD Road to Yelkapalli (Yelkapalli to Salugupalli) from km 0/0 to 15/0 including Construction of High Level Bridge at km 0/6-8 in Kumrambheem Asifabad District |
|---|---|
| Status | Application filed |
| Status since | 25 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Roads and Buildings Department |
| Land area | 25.1 acres (10.2 ha) |
| Project cost | ₹12.7 crore |
| Village / locality | Yelkapalle |
| Taluk / tehsil | Penchicalpet |
| District | Kumuram Bheem Asifabad |
| State | Telangana |
| Location from | Site area on record |
| Our reference | WID-TG-04375 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Dec 2022 | More information requested | 25.1 acres | ₹12.7 crore |
| New project (this page) | Application filed | 25.1 acres | ₹12.7 crore |
In context
32 applications in Kumuram Bheem Asifabad since January 2022 are in the same category (Roads & highways): 1 approved, 24 filed or under review, and 6 withdrawn, lapsed or rejected. At 25.1 acres, this one is larger than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Yelkapalle, Penchicalpet, Kumuram Bheem Asifabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BT Road from PWD Road to Yelkapalli (Yelkapalli to Salugupalli) from km 0/0 to… — more information requested, 650 m away
- Erection of 33KV Interlinking Line — lapsed, 2.5 km away
- Erection of 33KV Interlinking Line — lapsed, 2.5 km away
- Laying of Optical Fibre Cable Between Kagaznagar to Bejjur along the road… — lapsed, 3.7 km away
- Laying of Optical Fibre Cable Between Kagaznagar to Bejjur along the road… — more information requested, 3.7 km away
- Erection of 33KV Interlinking Line — more information requested, 3.9 km away
- Diversion of 0.063 Ha of Forest Land for Construction of 4G Mobile Tower under… — more information requested, 5.3 km away
- Diversion of 0.063 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 5.3 km away
More from Roads and Buildings Department in Kumuram Bheem Asifabad
- Bt Road From Loddiguda to Jambuldhara Road From Km 0/0 to 3/300 — lapsed
- BT Road from MDR road to Kaghaznagar (Wankidi to Kaghaznagar) — lapsed
- Bt Road From Pappanapet to Bejjur From Km 0/0 to 8/0 — lapsed
- O-Dimda to Chittam Road From Km 0/0 to 3/170 — lapsed
- BT Road from Kalwada to Peekalagudem (Via) Kunchavelli Road From Km 0/0 to 6/0 — lapsed
- Bt Road From Pappanapet to Bejjur From Km 0/0 to 8/0 — more information requested
10 Roads and Buildings Department projects in Kumuram Bheem Asifabad
All 36 Roads and Buildings Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.