Project details
| Official title | Diversion of 3.660 ha of forest land proposed for ST Habitations for Electrification of 1 No Un-Electrified and 2 Nos conversion of Single phase to 3 phase by laying of AB Cables (insulated) for Midde Chintha (Un-Electrified), Gandi Gopalpur & Islampur (conversion of Single phase to 3 phase) Tribal habitations in Kadarn Mandal of Forest Division, Khanapur of Nirmal District in favor of SE, Operation Circle, TSNPDCL, Nirmal |
|---|---|
| Status | More information requested |
| Status since | 23 Apr 2024 |
| Application filed | 23 Apr 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Northern Power Distribution Company of Telangana Limited |
| Land area | 9 acres (3.7 ha) |
| Project cost | ₹3.8 crore |
| Village / locality | Islampur |
| Taluk / tehsil | Kaddam Peddur |
| District | Nirmal |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04522 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jul 2025 | Lapsed | 9 acres | ₹3.8 crore |
| New project filed 23 Apr 2024 (this page) | More information requested | 9 acres | ₹3.8 crore |
In context
8 applications in Nirmal since January 2022 are in the same category (Power): 0 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Islampur, Kaddam Peddur, Nirmal, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 3.660 ha of forest land proposed for ST Habitations for… — lapsed, 0 m away
- Diversion of 3.660 ha of forest land proposed for ST Habitations for… — more information requested, 0 m away
- Diversion of 3.17 Ha of Forest Land in Khanapur Forest Division for… — more information requested, 13.7 km away
- Diversion of 3.17 Ha of Forest Land in Khanapur Forest Division for… — decision issued, 13.7 km away
- Laying of Optical Fibre Cable Between Nirmal to Kamepalli along the road… — more information requested, 17.6 km away
- Laying of Optical Fibre Cable Between Nirmal to Kamepalli along the road… — under wildlife review, 17.6 km away
- Diversion of 7.6104 ha of Forest Land proposal for laying of Optical Fiber… — more information requested, 19.2 km away
- Diversion of 7.6104 ha of Forest Land proposal for laying of Optical Fiber… — under forest review, 19.2 km away
More from Northern Power Distribution Company of Telangana Limited in Nirmal
- Laying of electrical 33KV interlinking line with Covered Conductor from the… — more information requested
- Laying of electrical 33KV interlinking line with Covered Conductor from the… — under wildlife review
- Diversion of 0.603 Ha of Forest Land Proposed for St Habitations for… — lapsed
- WL - Diversion of 5.169 ha of forest land proposed for 11 Nos ST Habitations… — more information requested
- Diversion of 3.660 ha of forest land proposed for ST Habitations for… — more information requested
- WL - Diversion of 0.603 ha of forest land proposed for ST Habitations for… — more information requested
11 Northern Power Distribution Company of Telangana projects in Nirmal
All 32 Northern Power Distribution Company of Telangana projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.