| Official title | Construction of High Level Bridge across River Godavari in between Manthani and Shivaram Villages in Peddapalli District, Telangana |
|---|---|
| Status | Under wildlife review |
| Status since | 3 Oct 2024 |
| Application filed | 3 Oct 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Md Inamuddin Zaffar |
| Village / locality | Birvalli |
| Taluk / tehsil | Chennur |
| District | Mancherial |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04526 |
In context
7 applications in Mancherial since January 2022 are in the same category (Buildings & townships): 0 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Birvalli, Chennur, Mancherial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land to an extent of 0.9813 Ha improvement of R&B Road to… — lapsed, 7.5 km away
- Diversion of 19.67462 Ha of Forest Land in Mancherial - 7.8995 Ha & Chennur -… — lapsed, 7.9 km away
- Telangana Education and Welfare Infrastructure Development Corporation of… — initial checks, 8.6 km away
- Indaram Khani 1A (IK 1A) Incline — under environmental review, 18.7 km away
- Laying of 33KV Overhead Transmission Line Adjacent to the Right Side of… — lapsed, 19.6 km away
- 4.99 Ha. Ordinary Sand Mine in Godavari river — environmental approval granted, 20.4 km away
- Assistant Director of Mines & Geology ,Mancherial- 0.40 Ha., — environmental approval granted, 24.8 km away
- Diversion of 3.2524 Ha of Forest Land for the Work of "widening to 4-Lane for… — forest land use approved, 25.3 km away
About this information