What is Developing? Open the mapMap

Under wildlife reviewWater & irrigation · Mulugu, Telangana

Diversion of 498.896 Ha of Forest Land Falling in Venkatapuram Forest Division of Mulugu District for Construction of Modikuntavagu Project- Package No. C1-20- Investigation, Design, Estimation and Execution of Reservoir Across Modikuntavagu, Krishnapuram (V), Wazeedu (M) of Mulugu District Comprising Construction of a Gated Spillway With Ogee Profile of Length 92.00 M in the Right Flank Portion With a Total Length of Earthen Dam of 1259m, Main Canal of Length 21.850 Km and 10 No. O

Diversion of 498.896 Ha of Forest Land Falling in Venkatapuram Forest Division of Mulugu District for Construction of Modikuntavagu Project- Package No. C1-20- Investigation, Design, Estimation and Execution of Reservoir Across Modikuntavagu, Krishnapuram (V), Wazeedu (M) of Mulugu District Comprising Construction of a Gated Spillway With Ogee Profile of Length 92.00 M in the Right Flank Portion With a Total Length of Earthen Dam of 1259m, Main Canal of Length 21.850 Km and 10 No. O is a proposed water and irrigation project in Arlagudem (G), Wajedu, Mulugu, Telangana. The site covers 1,420.5 acres. Its stated project cost is ₹718.6 crore. As of 27 Nov 2026, its status is “Under wildlife review” (since 9 Nov 2026).

See it on the live map All projects in Mulugu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 498.896 Ha of Forest Land Falling in Venkatapuram Forest Division of Mulugu District for Construction of Modikuntavagu Project- Package No. C1-20- Investigation, Design, Estimation and Execution of Reservoir Across Modikuntavagu, Krishnapuram (V), Wazeedu (M) of Mulugu District Comprising Construction of a Gated Spillway With Ogee Profile of Length 92.00 M in the Right Flank Portion With a Total Length of Earthen Dam of 1259m, Main Canal of Length 21.850 Km and 10 No. O is a proposed water and irrigation project in Arlagudem (G), Wajedu, Mulugu, Telangana. The site covers 1,420.5 acres.

Who is building it?

The applicant is Chief Engineer Glis Warangal.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Arlagudem (G), Wajedu, Mulugu, Telangana.

How big is it?

It has a stated cost of ₹718.6 crore and a site of 1,420.5 acres.

When was it filed?

The application was filed on 14 Oct 2025.

Project details

Official titleProposal for Diversion of 498.896 Ha of Forest Land Falling in Venkatapuram Forest Division of Mulugu District for Construction of Modikuntavagu Project- Package No. C1-20- Investigation, Design, Estimation and Execution of Reservoir Across Modikuntavagu, Krishnapuram (V), Wazeedu (M) of Mulugu District Comprising Construction of a Gated Spillway With Ogee Profile of Length 92.00 M in the Right Flank Portion With a Total Length of Earthen Dam of 1259m, Main Canal of Length 21.850 Km and 10 No. O
StatusUnder wildlife review
Status since9 Nov 2026
Application filed14 Oct 2025
Approval soughtWildlife review
Application typeNew project
SectorWater & irrigation
ApplicantChief Engineer Glis Warangal
Land area1,420.5 acres (574.9 ha)
Project cost₹718.6 crore
Village / localityArlagudem (G)
Taluk / tehsilWajedu
DistrictMulugu
StateTelangana
Location fromSite area on record
Our referenceWID-TG-04575

In context

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Arlagudem (G), Wajedu, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.