Application filedRoads & highways · Mancherial, Telangana

Diversion of 0.8690 ha of Forest Land for laying of Optical Fiber Cable(OFC) along the Right of Way (RoW)road in Girelli –A RF, at Compartment No. 442 & 420 of Kushnepally Range of Bellampally Division and Yenchapally Extn-2 RF, Yenchapally RF at Compartment No. 402,387,385,386,815,347,346,344,339 & 340 of Kotapally Range of Chennur Forest Division of Mancherial District, Telangana State in favour of M/s. Bharti Airtel Limited."

Diversion of 0.8690 ha of Forest Land for laying of Optical Fiber Cable(OFC) along the Right of Way (RoW)road in Girelli –A RF, at Compartment No. 442 & 420 of Kushnepally Range of Bellampally Division and Yenchapally Extn-2 RF, Yenchapally RF at Compartment No. 402,387,385,386,815,347,346,344,339 & 340 of Kotapally Range of Chennur Forest Division of Mancherial District, Telangana State in favour of M/s. Bharti Airtel Limited." is a proposed road project in Annaram, Kotapally, Mancherial, Telangana. The site covers 2.1 acres. Its stated project cost is ₹49 lakh. As of 27 Nov 2026, its status is “Application filed” (since 24 Jul 2026).

See it on the live map All projects in Mancherial

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusApplication filed
Status since24 Jul 2026
Application filed24 Jul 2026
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantBharti Airtel Limited
Land area2.1 acres (0.9 ha)
Project cost₹49 lakh
Village / localityAnnaram
Taluk / tehsilKotapally
DistrictMancherial
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-04585

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jul 2026 (this page)Application filed2.1 acres₹49 lakh
New project filed 24 Jul 2026Lapsed₹49 lakh

In context

23 applications in Mancherial since January 2022 are in the same category (Roads & highways): 3 approved, 9 filed or under review, and 10 withdrawn, lapsed or rejected. At 2.1 acres, this one is smaller than 75% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Annaram, Kotapally, Mancherial, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.