Project details
| Official title | Proposal for Construction of a High Level Bridge (Hlb) Across River Godavari to an Extent of 2.76 Ha (1.656 Ha in Pedapally and 1.104 Ha in Mancherial) Between Manthani and Shivaram in Peddapalli and Mancherial District, Where No Rf Involved, Bridge Is Falling in Shiwaram Wildlife Sanctuary and Formation of Approach Roads Is Falling in Its Eco-Sensitive Zone of the Wls of Pedapally and Chennur Division to Provide All-Weather Road Connectivity Between the Southern and Northern Regions of River Go |
|---|---|
| Status | More information requested |
| Status since | 4 Feb 2026 |
| Application filed | 4 Feb 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Md Inamuddin Zaffar |
| Village / locality | Manthani |
| Taluk / tehsil | Manthani |
| District | Peddapalli |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04590 |
In context
5 applications in Peddapalli since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Manthani, Peddapalli, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High Level Bridge (Hlb) Across River Godavari to an Extent of 2.76 Ha Between… — more information requested, 0 m away
- High Level Bridge across River Godavari in between Manthani and Shivaram… — withdrawn, 0 m away
- High Level Bridge across River Godavari in between Manthani & Shivaram Villages — more information requested, 1.9 km away
- High Level Bridge(Hlb) to an Extent of 2.76ha (2.256 Ha in Chennur Division… — more information requested, 2 km away
- Diversion of 1.6001 Hectare of Forest Land — under wildlife review, 5.1 km away
- Diversion of 1.6001 Hectare of Forest Land — more information requested, 5.1 km away
- Diversion Of 0.7514 Ha of Forest Land for Laying of Optical Fiber Cable along… — in-principle approval, conditions pending, 6.3 km away
- Diversion Of 0.7514 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 6.3 km away
More from Md Inamuddin Zaffar in Peddapalli
- High Level Bridge(Hlb) to an Extent of 2.76ha (2.256 Ha in Chennur Division… — more information requested
- High Level Bridge across River Godavari in between Manthani & Shivaram Villages — more information requested
- High Level Bridge (Hlb) Across River Godavari to an Extent of 2.76 Ha Between… — more information requested
- High Level Bridge across River Godavari in between Manthani and Shivaram… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.