Project details
| Official title | Laying of Optical Fiber Cable along the NH-363 road from Goegaon to Maharashtra Border within the existing ROW in Forest Land through Asifabad division of Komarambheem Asifabad District, Telangana State |
|---|---|
| Status | More information requested |
| Status since | 6 Feb 2026 |
| Application filed | 6 Feb 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bharti Airtel Limited |
| Land area | 600 m² |
| Project cost | ₹5 lakh |
| Village / locality | Goigaon |
| Taluk / tehsil | Wankidi |
| District | Kumuram Bheem Asifabad |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04603 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Feb 2026 (this page) | More information requested | 0.1 acres | ₹5 lakh |
| New project filed 26 Sept 2025 | Lapsed | 0.1 acres | ₹5 lakh |
In context
32 applications in Kumuram Bheem Asifabad since January 2022 are in the same category (Roads & highways): 1 approved, 24 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.
Where it is
Goigaon, Wankidi, Kumuram Bheem Asifabad, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Optical Fiber Cable along the NH-363 road from Goegaon to… — lapsed, 0 m away
- Chowpanguda to Gondhaour via Kanpur — more information requested, 10.6 km away
- Diversion of 0.021 Ha of Forest Land for Construction of 4G Mobile Tower under… — lapsed, 14.5 km away
- Diversion of 0.021 Ha of Forest Land for Construction of 4G Mobile Tower under… — more information requested, 14.8 km away
- Diversion of 0.021 Ha of Forest Land for Construction of 4G Mobile Tower under… — lapsed, 14.8 km away
- Cerulean-II Off-Stream Closed Loop Pumped Storage Project — cleared for impact study, 18.5 km away
- PR Road to Itikyalapahad — more information requested, 18.5 km away
- Diversion of 0.021 Ha of Forest Land for Construction of 4G Mobile Tower under… — lapsed, 19.2 km away
More from Bharti Airtel Limited in Kumuram Bheem Asifabad
- Diversion of 0.1072 Ha Revised From 0.1213 Ha of Forest Land for Laying of… — forest land use approved
- Diversion of 0.9770 Ha of Forest Land for LWE Phase-II Projects falling in… — forest land use approved
- Diversion of 0.9770 Ha of Forest Land for LWE Phase-II Projects falling in… — more information requested
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — decision issued
- Diversion of Forest Land for Laying of Optical Fibre Cable for Provision of 4g… — forest land use approved
- Diversion of 0.9770 Ha of Forest Land for LWE Phase-II Projects falling in… — more information requested
10 Bharti Airtel (Airtel) projects in Kumuram Bheem Asifabad
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.