Quick answers
What is Industrial project by M/s Pure Organic Industries?
This approved industrial project by M/s Pure Organic Industries is in Alattur, Tiruporur, Chengalpattu, Tamil Nadu. The site covers 1.3 acres.
Who is building it?
The applicant is M/S. Pure Organic Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Nov 2022), as of 27 Nov 2026.
Where is it?
In Alattur, Tiruporur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹9.8 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 9 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Nov 2022 |
| Application filed | 9 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S. Pure Organic Industries |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹9.8 crore |
| Village / locality | Alattur |
| Taluk / tehsil | Tiruporur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00009 |
In context
18 applications in Chengalpattu since January 2022 are in the same category (Industry): 12 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.3 acres, this one is smaller than 78% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alattur, Tiruporur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Change in Product Mix within Existing API Manufacturing Facility — initial checks, 150 m away
- Proposed Change in Product Mix within Existing API Manufacturing Facility — initial checks, 150 m away
- Proposed Expansion of Existing Production Capacity — under environmental review, 400 m away
- Proposed Expansion of Existing Production Capacity — under environmental review, 400 m away
- Proposed Expansion of Synthetic Organic Chemicals (Protected Amino Acid and… — cleared for impact study, 550 m away
- Proposed Expansion for Manufacturing of Synthetic Organic Chemicals – API… — environmental approval granted, 650 m away
- Proposed Expansion for Manufacturing of Synthetic Organic Chemicals – API… — environmental approval granted, 650 m away
- Proposed Expansion for Manufacturing of Synthetic Organic Chemicals – API… — cleared for impact study, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.