Quick answers
What is this project?
Proposed Construction – High Rise Group Development" - Consists of Block 1 with Combined Basement, Ground Floor +19 upper floors, Totally 548 Dwelling Units with (Club House Ground floor + 2 upper floors) is an approved building project in Karanai, 0, Chengalpattu, Tamil Nadu. The site covers 4.5 acres.
Who is building it?
The applicant is Krishnan Anukumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Nov 2022), as of 27 Nov 2026.
Where is it?
In Karanai, 0, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹193.5 crore and a site of 4.5 acres.
When was it filed?
The application was filed on 23 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Nov 2022 |
| Application filed | 23 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Krishnan Anukumar |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹193.5 crore |
| Village / locality | Karanai |
| Taluk / tehsil | 0 |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Village |
| Our reference | WID-TN-00062 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.5 acres, this one is smaller than 73% of them.
Where it is
Karanai, 0, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Building – High Rise and Non High Rise Group Development by M/s.… — more information requested, 650 m away
- Building project by M/s. Danub Homes Private Limited — environmental approval granted, 1000 m away
- High-Rise Residential Group development by M/s. Casagrand Builder Private… — environmental approval granted, 1.1 km away
- Expansion of Proposed Construction – High Rise Group Development" - Consists… — environmental approval granted, 1.4 km away
- Laying of Aerial Ofc Along the Road Side From Siruseri to Karanai Across… — lapsed, 1.6 km away
- Ponmar Polachery Road — lapsed, 1.8 km away
- Relaying and Periodical Maintenance of Ponmar Polachery road — lapsed, 1.8 km away
- Modification of Ec and Name Change of the Applicant M/S. Bscpl Infrastructure… — environmental approval granted, 2.3 km away
More from Krishnan Anukumar in Chengalpattu
- Expansion of Proposed Construction – High Rise Group Development" - Consists… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.