Quick answers
What is this project?
This approved mining project by M/s. Sri Blue Metals, over an Extent of 3.11.0 ha of Patta land in S.F.No. 77/1B and 421/2B (Part) of Chikkarampalayam Village, Mettupalayam Taluk, Coimbatore District is in Chikkarampalayam, Mettupalayam, Coimbatore, Tamil Nadu. The site covers 7.7 acres.
Who is building it?
The applicant is Siddharthamouli P Rsg.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2022), as of 27 Nov 2026.
Where is it?
In Chikkarampalayam, Mettupalayam, Coimbatore, Tamil Nadu.
How big is it?
It has a stated cost of ₹60 lakh and a site of 7.7 acres.
When was it filed?
The application was filed on 16 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2022 |
| Application filed | 16 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Siddharthamouli P Rsg |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Chikkarampalayam |
| Taluk / tehsil | Mettupalayam |
| District | Coimbatore |
| State | Tamil Nadu |
| Location from | Taluk / tehsil |
| Our reference | WID-TN-00082 |
In context
204 applications in Coimbatore since January 2022 are in the same category (Mining): 172 approved, 21 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.7 acres, this one is larger than 78% of them.
Where it is
Chikkarampalayam, Mettupalayam, Coimbatore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extension of Water Pipe line at Chennamalai H/o Chikkadasampalayam Panchayat… — forest land use approved, 2.3 km away
- JADAYAMPALAYAM VILLAGE, Rough Stone and Gravel Quarry project Belongs to Tvl.… — environmental approval granted, 5.6 km away
- Tvl. Saravana Blue Metals Industry Rough Stone and Gravel Quarry Extent of… — not approved, 5.6 km away
- Re-Laying of pipeline Laid By the Arulmighu vana Bathrakaliamman small Farmers… — initial checks, 5.8 km away
- Re-Laying of pipeline Laid By the Arulmighu vana Bathrakaliamman small Farmers… — lapsed, 5.8 km away
- Thiru. K. Sundararaj over an Extent of 3.96.0 ha of Patta land in S.F.No.… — under environmental review, 6.4 km away
- Mining project by M/s.Venkateswara Blue Metals over an Extent of 7.00.0 ha of… — environmental approval granted, 6.7 km away
- Jadayampalayam Village Rough Stone and Gravel Quarry — environmental approval granted, 7.4 km away
More from Siddharthamouli P Rsg in Coimbatore
- C.N.Mani, Rough Stone and Gravel quarry project over an Extent of 2.47.5Ha in… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.