Quick answers
What is Plasticizers Manufacturing Unit?
Plasticizers Manufacturing Unit is a proposed industrial project in Ingur, 05752, Ariyalur, Tamil Nadu. The site covers 3 acres.
Who is building it?
The applicant is Payal Plastichem Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Nov 2022), as of 27 Nov 2026.
Where is it?
In Ingur, 05752, Ariyalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹20 crore and a site of 3 acres.
When was it filed?
The application was filed on 7 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Plasticizers Manufacturing Unit
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Nov 2022 |
| Application filed | 7 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Payal Plastichem Private Limited |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹20 crore |
| Village / locality | Ingur |
| Taluk / tehsil | 05752 |
| District | Ariyalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00099 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Jan 2023 | Environmental approval granted | 3 acres | ₹20 crore |
| Early planning filed 7 Nov 2022 (this page) | Cleared for impact study | 3 acres | ₹20 crore |
In context
5 applications in Ariyalur since January 2022 are in the same category (Industry): 2 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Ingur, 05752, Ariyalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Plasticizers Manufacturing Unit — environmental approval granted, 0 m away
- Extension of validity of Environmental Clearance for Karuppur Kilapaluvur… — environmental approval granted, 168 km away
- Extension of EC Validity for Karuppur Senapathy Limestone Mining Lease (4.670… — environmental approval granted, 168.1 km away
- Extension of EC Validity for Karuppur Senapathy Limestone Mining Lease (4.670… — environmental approval granted, 168.1 km away
- Limekankar Deposit Quarry Project Belongs to S.Subramanian, Extent: 3.54.5ha… — environmental approval granted, 168.2 km away
- Limekankar Deposit Quarry Project Belongs to S.Subramanian, Extent: 3.54.5ha… — cleared for impact study, 168.2 km away
- Limekankar Quarry Project Belongs to Tvl. Vijay Cements — cleared for impact study, 168.3 km away
- Limekankar Quarry Lease of Chettinad Cement Corporation PVT. LTD. Over an Area… — environmental approval granted, 168.4 km away
All 4 Payal Plastichem projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.