Quick answers
What is P.Vasanthi Rough Stone Quarry?
P.Vasanthi Rough Stone Quarry is a proposed mining project in Madhukkarai, Madukkari, Coimbatore, Tamil Nadu. The site covers 2 acres.
Who is building it?
The applicant is Ponnusamy Vasanthi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Nov 2022), as of 27 Nov 2026.
Where is it?
In Madhukkarai, Madukkari, Coimbatore, Tamil Nadu.
How big is it?
It has a stated cost of ₹39 lakh and a site of 2 acres.
When was it filed?
The application was filed on 19 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: P.Vasanthi Rough Stone Quarry
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Nov 2022 |
| Application filed | 19 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ponnusamy Vasanthi |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹39 lakh |
| Village / locality | Madhukkarai |
| Taluk / tehsil | Madukkari |
| District | Coimbatore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00143 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2024 | Environmental approval granted | 2 acres | ₹39 lakh |
| Early planning filed 19 Nov 2022 (this page) | Cleared for impact study | 2 acres | ₹39 lakh |
In context
204 applications in Coimbatore since January 2022 are in the same category (Mining): 172 approved, 21 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Madhukkarai, Madukkari, Coimbatore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- P.Vasanthi Rough Stone Quarry — environmental approval granted, 0 m away
- V. Dhanalakshmi, Rough Stone and Gravel Quarry, Extent: 2.17.0ha S.F. Nos:… — environmental approval granted, 500 m away
- D.Jayakumar, Rough Stone and Gravel Quarry Project, Extent: 1.26.0ha S.F. Nos:… — environmental approval granted, 550 m away
- M.Shanmugam, Rough Stone and Gravel Quarry, Extent:3.32.5ha S.F.No.: 509/1(P)… — environmental approval granted, 700 m away
- M. Saravanan, Rough Stone and Gravel Quarry Extent: 2.54.58ha S.F. Nos: 509/2… — environmental approval granted, 700 m away
- Proposed formation of Girivala Pathai around Arulmigu Dharmalingeswara Swamy… — lapsed, 1.8 km away
- Building project by M/s. NDR SPACE PRIVATE LIMITED — environmental approval granted, 2.4 km away
- Proposed Expansion of Madukkarai Cement Grinding Unit and Packing unit with… — cleared for impact study, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.