Quick answers
What is this project?
This approved building project by Saravanakumar Natesan is in Maruluttu, Virudhunagar, Tamil Nadu. The site covers 5.9 acres.
Who is building it?
The applicant is Saravanakumar Natesan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 May 2023), as of 27 Nov 2026.
Where is it?
In Maruluttu, Virudhunagar, Tamil Nadu.
How big is it?
It has a stated cost of ₹151.2 crore and a site of 5.9 acres.
When was it filed?
The application was filed on 10 May 2023.
Project details
| Official title | Proposed Residential Cum Commercial Building Project |
|---|---|
| Status | Environmental approval granted |
| Status since | 10 May 2023 |
| Application filed | 10 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Saravanakumar Natesan |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹151.2 crore |
| Village / locality | Maruluttu |
| Taluk / tehsil | Virudhunagar |
| District | Virudhunagar |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00564 |
In context
10 applications in Virudhunagar since January 2022 are in the same category (Buildings & townships): 3 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected. At 5.9 acres, this one is smaller than 80% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maruluttu, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Limekankar Quarry of Thiru.K.Palaniappan — environmental approval granted, 1.7 km away
- Thiru.P.Ramar Rough stone and Gravel Quarry — environmental approval granted, 2.5 km away
- Rough Stone & Gravel Quarry of Thiru. P.Ramar — environmental approval granted, 2.6 km away
- Rough Stone and Gravel Quarry of P Thirupathi — environmental approval granted, 3.1 km away
- Rough Stone and Gravel Quarry of Smt. P.Seeniammal — environmental approval granted, 3.6 km away
- Rough Stone and Gravel Quarry of Thiru. S. Ravichandran — environmental approval granted, 4.5 km away
- Request for Name Change of EC titled 'Expansion by addition of 1x25 MW… — environmental approval granted, 5.2 km away
- Rough stone & Gravel quarry of Tmt.S.Shanmugammal — more information requested, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.