Quick answers
What is this project?
Quartz & Feldspar Quarry Project Belongs to M/s. Chettinad Morimura Semiconductor Extent: 2.02.5ha S.F.No. 2323/2 of Alampalayam Village, Dharapuram Taluk, Tiruppur District is an approved mining project in Alampalaiyam, Dharapuram, Tiruppur, Tamil Nadu. The site covers 5 acres.
Who is building it?
The applicant is Chettinad Morimura Semiconductor Material PVT LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Dec 2023), as of 27 Nov 2026.
Where is it?
In Alampalaiyam, Dharapuram, Tiruppur, Tamil Nadu.
How big is it?
It has a stated cost of ₹22 lakh and a site of 5 acres.
When was it filed?
The application was filed on 6 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Dec 2023 |
| Application filed | 6 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chettinad Morimura Semiconductor Material PVT LTD |
| Land area | 5 acres (2 ha) |
| Project cost | ₹22 lakh |
| Village / locality | Alampalaiyam |
| Taluk / tehsil | Dharapuram |
| District | Tiruppur |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-00784 |
In context
205 applications in Tiruppur since January 2022 are in the same category (Mining): 147 approved, 41 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5 acres, this one is larger than 51% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Alampalaiyam, Dharapuram, Tiruppur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ponnivadi Rough Stone and Gravel Quarry Project Belongs to Thiru. B. Saran… — environmental approval granted, 2.8 km away
- Kolathupalayam Village Rough Stone and Gravel Quarry Project — environmental approval granted, 8.1 km away
- R.Senthilkumar, Rough Stone Quarry Project Extent: 2.50.0ha S.F.No. 252/2 Part… — environmental approval granted, 9.4 km away
- A.Varadaraj Gravel Quarry — environmental approval granted, 10.1 km away
- Rough Stone Quarry of Thiru. S. Durairaj — under environmental review, 10.3 km away
- V. Maheswari Rough Stone and Gravel Quarry Project — environmental approval granted, 11 km away
- Rough Stone Quarry of Thiru D. Subash Chandra Bose — cleared for impact study, 11.5 km away
- Manakadavu Village Rough Stone mining Lease — under environmental review, 11.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.