Quick answers
What is Tiruvannamalai Pumped Storage Project (2000 MW)?
Tiruvannamalai Pumped Storage Project (2000 MW) is a proposed water and irrigation project in Karnatiogarh Reserved Forest, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The site covers 729 acres.
Who is building it?
The applicant is Eco Leap Technologies India Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Oct 2024), as of 27 Nov 2026.
Where is it?
In Karnatiogarh Reserved Forest, Jamunamarathoor, Tiruvannamalai, Tamil Nadu.
How big is it?
It has a stated cost of ₹11,558 crore and a site of 729 acres.
When was it filed?
The application was filed on 27 Dec 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Oct 2024 |
| Application filed | 27 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Eco Leap Technologies India Private Limited |
| Land area | 729 acres (295 ha) |
| Project cost | ₹11,558 crore |
| Village / locality | Karnatiogarh Reserved Forest |
| Taluk / tehsil | Jamunamarathoor |
| District | Tiruvannamalai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00870 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karnatiogarh Reserved Forest, Jamunamarathoor, Tiruvannamalai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bt Road Formation Works on Existing Polur Main Road to Thumbakadu Village… — lapsed, 4.3 km away
- Bt Road Formation Works on the Road From Polur-Alangayam Main Road to… — lapsed, 4.5 km away
- Laying of Aerial OFC along the road side across the Pattarvaikadu R.F. (Javadi… — lapsed, 4.5 km away
- BT road formation works on existing Kuttakkarai road between Kallakollai to… — lapsed, 4.6 km away
- Laying of Aerial Ofc Along the Road Side Across the Pattarvaikadu R.F. (Javadi… — lapsed, 5.1 km away
- Laying Underground Ofc Along Polur Jamunamarathur Road Through Forest Areas — more information requested, 5.3 km away
- Laying of Aerial Ofc Along the Road Side Across the Malaiyam R.F. (Javadi Hills) — lapsed, 6 km away
- Laying of Aerial OFC along the road side across the Malaiyam R.F. (Javadi Hills) — lapsed, 6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.