Quick answers
What is this project?
Sakkaramallur Village Sand Quarry (Palar River), Manual excavation method is an approved mining project in Sakkiramallur, Arcot, Ranipet, Tamil Nadu. The site covers 12.2 acres.
Who is building it?
The applicant is Office of the Executive Engineer Pwd.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Sept 2023), as of 27 Nov 2026.
Where is it?
In Sakkiramallur, Arcot, Ranipet, Tamil Nadu.
How big is it?
It has a stated cost of ₹30 lakh and a site of 12.2 acres.
When was it filed?
The application was filed on 8 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Sept 2023 |
| Application filed | 8 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Office of the Executive Engineer Pwd |
| Land area | 12.2 acres (5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Sakkiramallur |
| Taluk / tehsil | Arcot |
| District | Ranipet |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00883 |
In context
74 applications in Ranipet since January 2022 are in the same category (Mining): 46 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.2 acres, this one is larger than 78% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Sakkiramallur, Arcot, Ranipet, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sakkaramallur Village Sand Quarry (Palar River), Manual excavation method — returned to applicant, 0 m away
- Sakkaramallur Ordinary Earth Quarry Project — environmental approval granted, 1.9 km away
- Thiru.J.Chandrakumar Rough Stone and Gravel Quarry over an extent of 1.39.68… — environmental approval granted, 3.5 km away
- Ordinary Earth Quarry belongs to Thiru.S.Sathishkumar — environmental approval granted, 6.6 km away
- Thiru. A Maria William over an Extent of 1.00.0 ha in S.F. No. 1/4(Part-36),… — environmental approval granted, 7.3 km away
- Thiru. A. Dhanakarthikeyan Rough Stone Quarry S.F. No. 1/4 (Part-35) over an… — environmental approval granted, 7.4 km away
- M/s Blue Rock Crusher, Rough Stone Quarry over an Extent of 1.00.0 ha in S.F.… — environmental approval granted, 8 km away
- Proposed Common Bio-Medical Waste Treatment Facility — cleared for impact study, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.