Quick answers
What is this project?
Rough Stone and Gravel Quarry of M/s.KCC Buildcon Private Limited is an approved mining project in Surai, Nemili, Ranipet, Tamil Nadu. The site covers 3.6 acres.
Who is building it?
The applicant is Kcc Buildcon Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Apr 2023), as of 27 Nov 2026.
Where is it?
In Surai, Nemili, Ranipet, Tamil Nadu.
How big is it?
It has a stated cost of ₹58 lakh and a site of 3.6 acres.
When was it filed?
The application was filed on 3 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Apr 2023 |
| Application filed | 3 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kcc Buildcon Private Limited |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹58 lakh |
| Village / locality | Surai |
| Taluk / tehsil | Nemili |
| District | Ranipet |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01002 |
In context
74 applications in Ranipet since January 2022 are in the same category (Mining): 46 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.6 acres, this one is smaller than 66% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Surai, Nemili, Ranipet, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Rough Stone & Gravel Quarry of Thiru.R.Srinivasan — initial checks, 1.8 km away
- Govindacherry Village Earth Mining Lease — returned to applicant, 2.6 km away
- Rough Stone and Gravel Quarry of Tmt.K.Mageswari — environmental approval granted, 4.2 km away
- New Sand Foundry Unit by M/s. Brakes India Private Limited — lapsed, 4.5 km away
- Thiru.A.M.Krishnan Rough stone and Gravel Quarry — environmental approval granted, 4.6 km away
- Kodakkal Village Gravel and Rough Stone Mining Project — environmental approval granted, 5 km away
- Rough Stone Quarry of Tvl.KCC Buildcon Private Limited — environmental approval granted, 5.2 km away
- TAMIN-Kodakkal 6.00HA Black Granite Quarry — under environmental review, 5.4 km away
More from Kcc Buildcon Private Limited in Ranipet
- Ordinary earth quarry - Government land in (Padiyambakkam Tank)for M/s.KCC… — lapsed
- Ordinary Earth quarry of M/s. KCC Buildcon PVt Ltd — lapsed
- Govindacherry Village Earth Mining Lease — returned to applicant
- Rough Stone Quarry of Tvl.KCC Buildcon Private Limited — environmental approval granted
5 Kcc Buildcon projects in Ranipet
All 7 Kcc Buildcon projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.